ITAC Assessment: SF0270
ITAC logo
ITAC Assessment: SF0270
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2003
Principal Product Wines
NAICS 312130: Wineries
SIC 2084: Wines, Brandy, and Brandy Spirits
Sales Range $50
M
to 100
M
# of Employees 53
Plant Area 100,000
ft2
Annual Production 0
units
Production Hrs. Annual 5,137
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $140,507 1,338,640
kWh
Electricity Demand $39,460 3,811
kW-mo/yr
Natural Gas $10,134 1,676
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $59,233 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $18,201

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Solid Waste (non-haz) Savings Ancillary Material Cost Savings
01 2.7241: Install outside air damper / economizer on hvac unit $2,671 - $2,671
25,446
kWh
- - -
02 2.6218: Turn off equipment when not in use $244 - $244
2,329
kWh
- - -
03 2.7442: Keep doors and windows shut when not on use $9,405 $4,145 $9,405
89,566
kWh
- - -
04 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $14,226 $9,485 $10,741
102,332
kWh
$3,485
-
kW-mo/yr
- -
05 2.4111: Utilize energy-efficient belts and other improved mechanisms $1,081 $830 $879
8,374
kWh
$202
-
kW-mo/yr
- -
06 2.7145: Install skylights $3,975 $10,800 $2,623
24,990
kWh
$1,352
-
kW-mo/yr
- -
07 3.7312: Implement a regular maintenance program to reduce emissions from leaky valves and pipe fittings $3,034 - - - - $3,034
08 3.6193: Install equipment (eg compactor) to reduce disposal costs $9,418 $9,500 - - $9,418
-
lb
-
09 4.212: Adopt in-house material generation $15,179 $80,393 - - - $15,179
TOTAL RECOMMENDED $59,233 $115,153 $26,563
253,037
kWh
$5,039
-
kW-mo/yr
$9,418
-
lb
$18,213
TOTAL IMPLEMENTED $18,201 $20,285 $13,364
127,322
kWh
$4,837
-
kW-mo/yr
- -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Solid Waste (non-haz) Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs