Assessment Year | 2003 |
---|---|
Principal Product | Livestock Feed |
NAICS | 311119: Other Animal Food Manufacturing |
SIC | 2048: Prepared Feed and Feed Ingredients for Animals and Fowls, Except Dogs and Cats |
Sales Range | $10 M to 50M |
# of Employees | 55 |
Plant Area |
479,160
ft2
|
Annual Production | 220,000
ton
|
Production Hrs. Annual | 6,864
hrs
|
Location (State) | California |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $378,702 | 4,018,709 |
kWh
|
$0.094 |
Electricity Demand | $77,749 | 10,515 |
kW-mo/yr
|
$7.39 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $49,110 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $9,907 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
---|---|---|---|---|---|---|---|
01 | 2.6231: Utilize controls to operate equipment only when needed | $9,390 | $380 |
$8,572
90,970
kWh
|
$818
-
kW-mo/yr
|
- | |
02 | 2.6231: Utilize controls to operate equipment only when needed | $4,384 | $1,271 |
$3,856
40,918
kWh
|
$528
-
kW-mo/yr
|
- | |
03 | 2.6231: Utilize controls to operate equipment only when needed | $976 | $286 |
$976
10,356
kWh
|
- | - | |
04 | 2.1311: Replace electrically-operated equipment with fossil fuel equipment | $2,934 | $1,230 |
$3,774
39,312
kWh
|
$280
-
kW-mo/yr
|
$(-1,120.0)
-
MMBtu
|
|
05 | 2.2136: Install / repair insulation on steam lines | $16,200 | $8,976 | - | - |
$16,200
-
MMBtu
|
|
06 | 2.4133: Use most efficient type of electric motors | $3,600 | - |
$3,166
33,598
kWh
|
$434
-
kW-mo/yr
|
- | |
07 | 2.2136: Install / repair insulation on steam lines | $503 | $824 | - | - |
$503
-
MMBtu
|
|
08 | 2.7135: Install occupancy sensors | $1,420 | $2,280 |
$1,250
13,267
kWh
|
$170
-
kW-mo/yr
|
- | |
09 | 2.4324: Replace hydraulic / pneumatic equipment with electric equipment | $8,089 | $19,616 |
$7,114
100,842
kWh
|
$975
-
kW-mo/yr
|
- | |
10 | 2.7132: Install timers on light switches in little used areas | $1,614 | $5,500 |
$1,419
7,492
kWh
|
$195
-
kW-mo/yr
|
- | |
TOTAL RECOMMENDED | $49,110 | $40,363 |
$30,127
336,755
kWh
|
$3,400
-
kW-mo/yr
|
$15,583
-
MMBtu
|
||
TOTAL IMPLEMENTED | $9,907 | $4,375 |
$8,272
87,783
kWh
|
$1,132
-
kW-mo/yr
|
$503
-
MMBtu
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs