ITAC Assessment: SF0265
ITAC logo
ITAC Assessment: SF0265
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2003
Principal Product Livestock Feed
NAICS 311119: Other Animal Food Manufacturing
SIC 2048: Prepared Feed and Feed Ingredients for Animals and Fowls, Except Dogs and Cats
Sales Range $10
M
to 50
M
# of Employees 55
Plant Area 479,160
ft2
Annual Production 220,000
ton
Production Hrs. Annual 6,864
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $378,702 4,018,709
kWh
Electricity Demand $77,749 10,515
kW-mo/yr
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $49,110 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $9,907

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.6231: Utilize controls to operate equipment only when needed $9,390 $380 $8,572
90,970
kWh
$818
-
kW-mo/yr
-
02 2.6231: Utilize controls to operate equipment only when needed $4,384 $1,271 $3,856
40,918
kWh
$528
-
kW-mo/yr
-
03 2.6231: Utilize controls to operate equipment only when needed $976 $286 $976
10,356
kWh
- -
04 2.1311: Replace electrically-operated equipment with fossil fuel equipment $2,934 $1,230 $3,774
39,312
kWh
$280
-
kW-mo/yr
$(-1,120.0)
-
MMBtu
05 2.2136: Install / repair insulation on steam lines $16,200 $8,976 - - $16,200
-
MMBtu
06 2.4133: Use most efficient type of electric motors $3,600 - $3,166
33,598
kWh
$434
-
kW-mo/yr
-
07 2.2136: Install / repair insulation on steam lines $503 $824 - - $503
-
MMBtu
08 2.7135: Install occupancy sensors $1,420 $2,280 $1,250
13,267
kWh
$170
-
kW-mo/yr
-
09 2.4324: Replace hydraulic / pneumatic equipment with electric equipment $8,089 $19,616 $7,114
100,842
kWh
$975
-
kW-mo/yr
-
10 2.7132: Install timers on light switches in little used areas $1,614 $5,500 $1,419
7,492
kWh
$195
-
kW-mo/yr
-
TOTAL RECOMMENDED $49,110 $40,363 $30,127
336,755
kWh
$3,400
-
kW-mo/yr
$15,583
-
MMBtu
TOTAL IMPLEMENTED $9,907 $4,375 $8,272
87,783
kWh
$1,132
-
kW-mo/yr
$503
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs