ITAC Assessment: SF0248
ITAC logo
ITAC Assessment: SF0248
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2002
Principal Product Vanadium Catalyst
NAICS
n/a
SIC 2819: Industrial Inorganic Chemicals, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 20
Plant Area 137,500
ft2
Annual Production 0
units
Production Hrs. Annual 5,520
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $132,478 1,825,187
kWh
Electricity Demand $6,079 2,422
kW-mo/yr
Natural Gas $125,704 20,117
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $21,647 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $11,125

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Solid Waste (non-haz) Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,662 - $1,662
14,856
kWh
-
02 2.4226: Use / purchase optimum sized compressor $9,169 $1,436 $9,169
69,412
kWh
-
03 2.4131: Size electric motors for peak operating efficiency $1,713 $1,685 $1,713
12,630
kWh
-
04 2.7134: Use photocell controls $5,341 $6,000 $5,341
40,435
kWh
-
05 4.111: Add equipment/ operators to reduce production bottleneck $513 $700 $513
3,885
kWh
-
06 2.7132: Install timers on light switches in little used areas $2,409 $13,000 $2,409
18,084
kWh
-
07 3.7198: Reduce / eliminate use of disposable product $840 - - $840
-
lb
TOTAL RECOMMENDED $21,647 $22,821 $20,807
159,302
kWh
$840
-
lb
TOTAL IMPLEMENTED $11,125 $20,685 $11,125
86,005
kWh
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Solid Waste (non-haz) Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs