| Assessment Year | 2003 |
|---|---|
| Principal Product | Axles, Yolks and Shafts |
| NAICS | 332111: Iron and Steel Forging |
| SIC | 3462: Iron and Steel Forgings |
| Sales Range | $10 M to 50M |
| # of Employees | 76 |
| Plant Area |
113,355
ft2
|
| Annual Production | 30,842,000
lb
|
| Production Hrs. Annual | 4,080
hrs
|
| Location (State) | Illinois |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $132,378 | 2,587,277 |
kWh
|
$0.051 |
| Electricity Demand | $32,344 | 9,321 |
kW-mo/yr
|
$3.47 |
| Electricity Fees | $24,753 | - |
|
- |
| Natural Gas | $311,972 | 79,787 |
MMBtu
|
$3.91 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $30,718 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $3,069 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Personnel Changes Savings | Ancillary Material Cost Savings |
|---|---|---|---|---|---|---|---|---|---|
| 01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $2,372 | $9,932 |
$1,697
28,231
kWh
|
$464
-
kW-mo/yr
|
- | $2 | $209 | |
| 02 | 2.4133: Use most efficient type of electric motors | $1,389 | $6,391 |
$1,137
18,944
kWh
|
$252
-
kW-mo/yr
|
- | - | - | |
| 03 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $3,069 | $2,300 |
$2,625
43,765
kWh
|
$444
-
kW-mo/yr
|
- | - | - | |
| 04 | 2.2437: Recover waste heat from equipment | $14,213 | $127,200 | - | - |
$14,213
-
MMBtu
|
- | - | |
| 05 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $9,675 | $43,955 |
$8,681
144,865
kWh
|
$1,477
-
kW-mo/yr
|
- | $(-270.0) | $(-213.0) | |
| TOTAL RECOMMENDED | $30,718 | $189,778 |
$14,140
235,805
kWh
|
$2,637
-
kW-mo/yr
|
$14,213
-
MMBtu
|
$(-268.0) | $(-4.0) | ||
| TOTAL IMPLEMENTED | $3,069 | $2,300 |
$2,625
43,765
kWh
|
$444
-
kW-mo/yr
|
- | - | - | ||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs