ITAC Assessment: MS0386
ITAC logo
ITAC Assessment: MS0386
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2012
Principal Product Automotive Metal Parts
NAICS 336370: Motor Vehicle Metal Stamping
SIC 3465: Automotive Stampings
Sales Range $10
M
to 50
M
# of Employees 106
Plant Area 392,000
ft2
Annual Production 1
units
Production Hrs. Annual 4,900
hrs
Location (State) Mississippi

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $618,150 11,048,995
kWh
Electricity Demand $127,940 23,914
kW-mo/yr
Electricity Fees $72,545 -
Natural Gas $49,199 5,688
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $63,788 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $23,618

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $21,667 $253,328 $19,199
336,839
kWh
$2,468
-
kW-mo/yr
- -
02 2.7241: Install outside air damper / economizer on hvac unit $32,459 $4,830 $29,048
511,505
kWh
- $3,411 -
03 2.2437: Recover waste heat from equipment $6,854 $7,104 - - - $6,854
-
MMBtu
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,951 $386 $1,720
30,776
kWh
- $231 -
05 2.7135: Install occupancy sensors $857 $97 $760
13,376
kWh
- $97 -
TOTAL RECOMMENDED $63,788 $265,745 $50,727
892,496
kWh
$2,468
-
kW-mo/yr
$3,739 $6,854
-
MMBtu
TOTAL IMPLEMENTED $23,618 $253,714 $20,919
367,615
kWh
$2,468
-
kW-mo/yr
$231 -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs