ITAC Assessment: SF0243
ITAC logo
ITAC Assessment: SF0243
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2002
Principal Product Irrigation Equipment
NAICS
n/a
SIC 3523: Farm Machinery and Equipment
Sales Range $5
M
to 10
M
# of Employees 75
Plant Area 120,214
ft2
Annual Production 1,000,000
pieces
Production Hrs. Annual 4,160
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $168,435 1,575,360
kWh
Electricity Demand $55,212 12,832
kW-mo/yr
Natural Gas $8,280 1,221
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $41,007 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $9,234

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Fees Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $3,347 $240 $3,347
25,921
kWh
-
02 2.2514: Cover open tanks $10,716 $1,500 $10,716
113,466
kWh
-
03 2.4224: Upgrade controls on compressors $2,052 $767 $2,052
14,710
kWh
-
04 2.5123: Reduce fluid flow rates $5,761 $4,416 $5,761
41,604
kWh
-
05 2.7135: Install occupancy sensors $973 $975 $973
7,469
kWh
-
06 2.4111: Utilize energy-efficient belts and other improved mechanisms $1,777 $1,770 $1,777
17,374
kWh
-
07 2.5123: Reduce fluid flow rates $5,887 $5,671 $5,887
29,131
kWh
-
08 2.4133: Use most efficient type of electric motors $1,004 $984 $1,004
7,863
kWh
-
09 2.4226: Use / purchase optimum sized compressor $1,758 $4,451 $1,758
13,965
kWh
-
10 2.7124: Make a practice of turning off lights when not needed $4,349 $18,180 $4,349
33,376
kWh
-
11 2.3137: Use power during off-peak periods $3,383 - - $3,383
TOTAL RECOMMENDED $41,007 $38,954 $37,624
304,879
kWh
$3,383
TOTAL IMPLEMENTED $9,234 $5,911 $9,234
55,052
kWh
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Fees Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs