Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2002
Principal Product Automotive Rubber Seals
NAICS
n/a
SIC 3714: Motor Vehicle Parts and Accessories
Sales Range $10
M
to 50
M
# of Employees 180
Plant Area 54,700
ft2
Annual Production 4,500,000
pieces
Production Hrs. Annual 4,454
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $197,985 2,135,058
kWh
Electricity Demand $68,087 5,564
kW-mo/yr
Natural Gas $13,200 1,640
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $66,748 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $2,590

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Solid Waste (non-haz) Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $2,590 - $2,590
16,398
kWh
-
02 2.4223: Install direct acting units in place of compressed air pressure system in safety system $1,388 $380 $1,388
10,446
kWh
-
03 2.7132: Install timers on light switches in little used areas $2,551 $1,000 $2,551
14,752
kWh
-
04 2.4133: Use most efficient type of electric motors $1,747 $777 $1,747
10,114
kWh
-
05 2.7135: Install occupancy sensors $238 $120 $238
1,379
kWh
-
06 2.4224: Upgrade controls on compressors $1,694 $1,002 $1,694
9,414
kWh
-
07 2.7142: Utilize higher efficiency lamps and/or ballasts $5,515 $11,595 $5,515
30,637
kWh
-
08 2.5123: Reduce fluid flow rates $19,758 $50,798 $19,758
96,121
kWh
-
09 3.5217: Reuse / recycle/ sell paper products $10,700 $8,117 - $10,700
-
lb
10 3.6193: Install equipment (eg compactor) to reduce disposal costs $20,567 $16,445 - $20,567
-
lb
TOTAL RECOMMENDED $66,748 $90,234 $35,481
189,261
kWh
$31,267
-
lb
TOTAL IMPLEMENTED $2,590 - $2,590
16,398
kWh
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Solid Waste (non-haz) Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs