| Assessment Year | 2002 |
|---|---|
| Principal Product | Printed Adhesive Label |
| NAICS |
n/a
|
| SIC | 2672: Coated and Laminated Paper, Not Elsewhere Classified |
| Sales Range | $5 M to 10M |
| # of Employees | 51 |
| Plant Area |
25,000
ft2
|
| Annual Production | 200,000,000
units
|
| Production Hrs. Annual | 4,160
hrs
|
| Location (State) | California |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $49,252 | 442,186 |
kWh
|
$0.11 |
| Electricity Demand | $3,375 | 759 |
kW-mo/yr
|
$4.45 |
| Natural Gas | $5,913 | 476 |
MMBtu
|
$12.42 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $24,477 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | - | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Solid Waste (non-haz) Savings |
|---|---|---|---|---|---|---|
| 01 | 2.4224: Upgrade controls on compressors | $2,857 | $1,370 |
$2,857
22,928
kWh
|
- | |
| 02 | 2.2314: Replace heat treating oven with more efficient unit | $1,602 | $1,165 |
$1,602
22,464
kWh
|
- | |
| 03 | 2.4239: Eliminate or reduce compressed air usage | $2,638 | $2,860 |
$2,638
21,956
kWh
|
- | |
| 04 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $3,051 | $12,627 |
$3,051
24,532
kWh
|
- | |
| 05 | 3.6193: Install equipment (eg compactor) to reduce disposal costs | $14,329 | $16,545 | - |
$14,329
-
lb
|
|
| TOTAL RECOMMENDED | $24,477 | $34,567 |
$10,148
91,880
kWh
|
$14,329
-
lb
|
||
| TOTAL IMPLEMENTED | - | - | - | - | ||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs