ITAC Assessment: SF0238
ITAC logo
ITAC Assessment: SF0238
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2002
Principal Product Printed Adhesive Label
NAICS
n/a
SIC 2672: Coated and Laminated Paper, Not Elsewhere Classified
Sales Range $5
M
to 10
M
# of Employees 51
Plant Area 25,000
ft2
Annual Production 200,000,000
units
Production Hrs. Annual 4,160
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $49,252 442,186
kWh
Electricity Demand $3,375 759
kW-mo/yr
Natural Gas $5,913 476
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $24,477 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Solid Waste (non-haz) Savings
01 2.4224: Upgrade controls on compressors $2,857 $1,370 $2,857
22,928
kWh
-
02 2.2314: Replace heat treating oven with more efficient unit $1,602 $1,165 $1,602
22,464
kWh
-
03 2.4239: Eliminate or reduce compressed air usage $2,638 $2,860 $2,638
21,956
kWh
-
04 2.7142: Utilize higher efficiency lamps and/or ballasts $3,051 $12,627 $3,051
24,532
kWh
-
05 3.6193: Install equipment (eg compactor) to reduce disposal costs $14,329 $16,545 - $14,329
-
lb
TOTAL RECOMMENDED $24,477 $34,567 $10,148
91,880
kWh
$14,329
-
lb
TOTAL IMPLEMENTED - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs