Assessment Year | 2002 |
---|---|
Principal Product | PVC pipes |
NAICS |
n/a
|
SIC | 3084: Plastics Pipe |
Sales Range | $50 M to 100M |
# of Employees | 140 |
Plant Area |
388,800
ft2
|
Annual Production | 0
units
|
Production Hrs. Annual | 8,568
hrs
|
Location (State) | California |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $1,061,857 | 25,352,000 |
kWh
|
$0.042 |
Electricity Demand | $175,032 | 57,264 |
kW-mo/yr
|
$3.06 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $65,945 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $37,819 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings |
---|---|---|---|---|---|---|
01 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $17,279 | - |
$17,279
204,573
kWh
|
- | |
02 | 2.1121: Use insulation in furnaces to facilitate heating / cooling | $3,632 | $440 |
$3,632
43,919
kWh
|
- | |
03 | 2.4133: Use most efficient type of electric motors | $10,490 | $1,146 |
$10,490
120,591
kWh
|
- | |
04 | 2.4224: Upgrade controls on compressors | $856 | $618 | - |
$856
-
MMBtu
|
|
05 | 2.2614: Use cooling tower or economizer to replace chiller cooling | $6,418 | $5,500 |
$6,418
77,600
kWh
|
- | |
06 | 2.7135: Install occupancy sensors | $5,507 | $11,580 |
$5,507
64,078
kWh
|
- | |
07 | 2.5123: Reduce fluid flow rates | $10,895 | $20,460 |
$10,895
115,681
kWh
|
- | |
08 | 2.4322: Use or replace with energy efficient substitutes | $4,503 | $13,784 |
$4,503
50,943
kWh
|
- | |
09 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $6,365 | $30,620 | n/a |
$6,365
72,338
kWh
|
- |
TOTAL RECOMMENDED | $65,945 | $84,148 |
$65,089
749,723
kWh
|
$856
-
MMBtu
|
||
TOTAL IMPLEMENTED | $37,819 | $7,086 |
$37,819
446,683
kWh
|
- | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs