ITAC Assessment: SF0236
ITAC logo
ITAC Assessment: SF0236
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2002
Principal Product PVC pipes
NAICS
n/a
SIC 3084: Plastics Pipe
Sales Range $50
M
to 100
M
# of Employees 140
Plant Area 388,800
ft2
Annual Production 0
units
Production Hrs. Annual 8,568
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $1,061,857 25,352,000
kWh
Electricity Demand $175,032 57,264
kW-mo/yr
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $65,945 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $37,819

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $17,279 - $17,279
204,573
kWh
-
02 2.1121: Use insulation in furnaces to facilitate heating / cooling $3,632 $440 $3,632
43,919
kWh
-
03 2.4133: Use most efficient type of electric motors $10,490 $1,146 $10,490
120,591
kWh
-
04 2.4224: Upgrade controls on compressors $856 $618 - $856
-
MMBtu
05 2.2614: Use cooling tower or economizer to replace chiller cooling $6,418 $5,500 $6,418
77,600
kWh
-
06 2.7135: Install occupancy sensors $5,507 $11,580 $5,507
64,078
kWh
-
07 2.5123: Reduce fluid flow rates $10,895 $20,460 $10,895
115,681
kWh
-
08 2.4322: Use or replace with energy efficient substitutes $4,503 $13,784 $4,503
50,943
kWh
-
09 2.7142: Utilize higher efficiency lamps and/or ballasts $6,365 $30,620 n/a $6,365
72,338
kWh
-
TOTAL RECOMMENDED $65,945 $84,148 $65,089
749,723
kWh
$856
-
MMBtu
TOTAL IMPLEMENTED $37,819 $7,086 $37,819
446,683
kWh
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs