ITAC Assessment: SF0231
ITAC logo
ITAC Assessment: SF0231
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2002
Principal Product Thin Film Optics
NAICS
n/a
SIC 3827: Optical Instruments and Lenses
Sales Range greater than $500
M
# of Employees 1,138
Plant Area 490,000
ft2
Annual Production 0
units
Production Hrs. Annual 8,736
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $2,928,989 65,006,307
kWh
Natural Gas $246,245 47,249
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $521,556 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Solid Waste (non-haz) Savings
01 2.7144: Install spectral reflectors / delamp $8,403 $913 n/a $8,403
85,618
kWh
- -
02 2.4133: Use most efficient type of electric motors $5,732 $4,138 n/a $5,732
63,050
kWh
- -
03 2.4224: Upgrade controls on compressors $20,883 $15,071 n/a $20,883
218,586
kWh
- -
04 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $48,328 $42,988 n/a $48,328
652,416
kWh
- -
05 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $22,557 $20,529 n/a $22,557
247,412
kWh
- -
06 2.2312: Minimize non-essential material in heat treatment process $2,391 $2,193 n/a $2,391
28,742
kWh
- -
07 2.2191: Substitute hot process fluids for steam $5,916 $5,753 n/a $5,916
83,360
kWh
- -
08 2.7134: Use photocell controls $7,529 $8,040 n/a $7,529
80,792
kWh
- -
09 2.1243: Use heat from boiler blowdown to preheat boiler feed water $6,658 $8,500 n/a - $6,658
-
MMBtu
-
10 2.7142: Utilize higher efficiency lamps and/or ballasts $10,934 $27,835 n/a $10,934
117,019
kWh
- -
11 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $2,491 $6,516 n/a $2,491
27,300
kWh
- -
12 2.7142: Utilize higher efficiency lamps and/or ballasts $73,389 $280,599 n/a $73,389
783,110
kWh
- -
13 3.8143: Recycle cleaning solvent and reuse $298,889 $560,000 n/a - - $298,889
-
lb
14 3.6193: Install equipment (eg compactor) to reduce disposal costs $5,215 $15,574 n/a - - $5,215
-
lb
15 3.5315: Lease / purchase baler; sell cardboard to recycler $2,241 $7,875 n/a - - $2,241
-
lb
TOTAL RECOMMENDED $521,556 $1,006,524 $208,553
2,387,405
kWh
$6,658
-
MMBtu
$306,345
-
lb
TOTAL IMPLEMENTED - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Solid Waste (non-haz) Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs