ITAC Assessment: OR0572
ITAC logo
ITAC Assessment: OR0572
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2011
Principal Product Utility Poles
NAICS 321114: Wood Preservation
SIC 2491: Wood Preserving
Sales Range $10
M
to 50
M
# of Employees 40
Plant Area 28,000
ft2
Annual Production 1,000
units
Production Hrs. Annual 8,760
hrs
Location (State) Oregon

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $67,610 1,910,784
kWh
Electricity Demand $2,568 437
kW-mo/yr
Natural Gas $242,360 40,360
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $28,890 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $10,490

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
01 2.4224: Upgrade controls on compressors $6,860 $3,642 $6,860
196,000
kWh
- -
02 2.4131: Size electric motors for peak operating efficiency $1,220 $2,280 $1,220
34,600
kWh
- -
03 2.4131: Size electric motors for peak operating efficiency $770 $2,280 $770
21,600
kWh
- -
04 2.2136: Install / repair insulation on steam lines $2,350 $4,320 - $2,350
-
MMBtu
-
05 2.7142: Utilize higher efficiency lamps and/or ballasts $7,070 $4,559 $4,922
127,000
kWh
- $2,148
06 2.2441: Preheat boiler makeup water with waste process heat $8,030 $14,750 - $8,030
-
MMBtu
-
07 2.1231: Establish burner maintenance schedule for boilers $1,280 $500 - $1,780
-
MMBtu
$(-500.0)
08 2.1113: Reduce combustion air flow to optimum $1,310 $1,170 $1,310
37,126
kWh
- -
TOTAL RECOMMENDED $28,890 $33,501 $15,082
416,326
kWh
$12,160
-
MMBtu
$1,648
TOTAL IMPLEMENTED $10,490 $8,462 $6,860
196,000
kWh
$4,130
-
MMBtu
$(-500.0)
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs