Assessment Year | 2011 |
---|---|
Principal Product | Utility Poles |
NAICS | 321114: Wood Preservation |
SIC | 2491: Wood Preserving |
Sales Range | $10 M to 50M |
# of Employees | 40 |
Plant Area |
28,000
ft2
|
Annual Production | 1,000
units
|
Production Hrs. Annual | 8,760
hrs
|
Location (State) | Oregon |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $67,610 | 1,910,784 |
kWh
|
$0.035 |
Electricity Demand | $2,568 | 437 |
kW-mo/yr
|
$5.88 |
Natural Gas | $242,360 | 40,360 |
MMBtu
|
$6.00 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $28,890 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $10,490 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings |
---|---|---|---|---|---|---|---|
01 | 2.4224: Upgrade controls on compressors | $6,860 | $3,642 |
$6,860
196,000
kWh
|
- | - | |
02 | 2.4131: Size electric motors for peak operating efficiency | $1,220 | $2,280 |
$1,220
34,600
kWh
|
- | - | |
03 | 2.4131: Size electric motors for peak operating efficiency | $770 | $2,280 |
$770
21,600
kWh
|
- | - | |
04 | 2.2136: Install / repair insulation on steam lines | $2,350 | $4,320 | - |
$2,350
-
MMBtu
|
- | |
05 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $7,070 | $4,559 |
$4,922
127,000
kWh
|
- | $2,148 | |
06 | 2.2441: Preheat boiler makeup water with waste process heat | $8,030 | $14,750 | - |
$8,030
-
MMBtu
|
- | |
07 | 2.1231: Establish burner maintenance schedule for boilers | $1,280 | $500 | - |
$1,780
-
MMBtu
|
$(-500.0) | |
08 | 2.1113: Reduce combustion air flow to optimum | $1,310 | $1,170 |
$1,310
37,126
kWh
|
- | - | |
TOTAL RECOMMENDED | $28,890 | $33,501 |
$15,082
416,326
kWh
|
$12,160
-
MMBtu
|
$1,648 | ||
TOTAL IMPLEMENTED | $10,490 | $8,462 |
$6,860
196,000
kWh
|
$4,130
-
MMBtu
|
$(-500.0) | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs