ITAC Assessment: SF0225
ITAC logo
ITAC Assessment: SF0225
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2001
Principal Product mattresses and box springs
NAICS
n/a
SIC 2515: Mattresses, Foundations, and Convertible Beds
Sales Range $50
M
to 100
M
# of Employees 160
Plant Area 238,000
ft2
Annual Production 350,000
units
Production Hrs. Annual 4,550
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $106,041 920,400
kWh
Natural Gas $127 12
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $20,754 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $8,089

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings
01 3.7392: Apply a protective coating to racks and tanks $2,925 - $2,925
20,519
kWh
02 2.4221: Install compressor air intakes in coolest locations $1,216 $112 $1,216
8,537
kWh
03 2.4239: Eliminate or reduce compressed air usage $3,948 $2,195 $3,948
27,708
kWh
04 2.7142: Utilize higher efficiency lamps and/or ballasts $3,618 $4,030 $3,618
25,389
kWh
05 2.7135: Install occupancy sensors $7,920 $14,210 $7,920
55,583
kWh
06 2.7132: Install timers on light switches in little used areas $897 $2,040 $897
6,297
kWh
07 4.111: Add equipment/ operators to reduce production bottleneck $230 $618 $230
1,613
kWh
TOTAL RECOMMENDED $20,754 $23,205 $20,754
145,646
kWh
TOTAL IMPLEMENTED $8,089 $2,307 $8,089
56,764
kWh
Yearly Savings* Imp'd Cost* Electricity Usage Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs