ITAC Assessment: SF0220
ITAC logo
ITAC Assessment: SF0220
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2001
Principal Product Epoxy adhesives
NAICS
n/a
SIC 2891: Adhesives and Sealants
Sales Range $10
M
to 50
M
# of Employees 200
Plant Area 38,000
ft2
Annual Production 0
units
Production Hrs. Annual 6,000
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $429,266 4,599,234
kWh
Natural Gas $147,744 24,897
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $82,709 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $52,192

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.5123: Reduce fluid flow rates $51,887 $240 - $51,887
-
MMBtu
02 2.6218: Turn off equipment when not in use $924 - $924
9,945
kWh
-
03 2.1321: Replace fossil fuel equipment with electrical equipment $9,165 $2,491 $9,165
98,550
kWh
-
04 2.4224: Upgrade controls on compressors $305 $257 $305
3,278
kWh
-
05 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $3,154 $3,275 $3,154
36,281
kWh
-
06 2.1321: Replace fossil fuel equipment with electrical equipment $15,604 $30,000 $15,604
230,400
kWh
-
07 2.7132: Install timers on light switches in little used areas $1,670 $4,200 $1,670
17,955
kWh
-
TOTAL RECOMMENDED $82,709 $40,463 $30,822
396,409
kWh
$51,887
-
MMBtu
TOTAL IMPLEMENTED $52,192 $497 $305
3,278
kWh
$51,887
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs