| Assessment Year | 2001 |
|---|---|
| Principal Product | Cement Dust |
| NAICS |
n/a
|
| SIC | 3241: Cement, Hydraulic |
| Sales Range | $50 M to 100M |
| # of Employees | 217 |
| Plant Area |
780,084
ft2
|
| Annual Production | 1,570,000
ton
|
| Production Hrs. Annual | 8,064
hrs
|
| Location (State) | California |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $2,707,019 | 70,000,620 |
kWh
|
$0.039 |
| Natural Gas | $1,132,609 | 218,325 |
MMBtu
|
$5.19 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $5,006,210 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $131,098 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Coal Savings |
|---|---|---|---|---|---|---|
| 01 | 4.132: Purchase new equipment to reduce material use / cost | $83,016 | - | - |
$83,016
-
MMBtu
|
|
| 02 | 2.4224: Upgrade controls on compressors | $24,891 | $400 |
$24,891
643,685
kWh
|
- | |
| 03 | 4.132: Purchase new equipment to reduce material use / cost | $1,884 | $530 |
$1,884
57,751
kWh
|
- | |
| 04 | 2.4234: Cool compressor air intake with heat exchanger | $14,286 | $2,150 |
$14,286
63,165
kWh
|
- | |
| 05 | 2.4133: Use most efficient type of electric motors | $8,905 | $7,982 |
$8,905
200,297
kWh
|
- | |
| 06 | 2.4239: Eliminate or reduce compressed air usage | $38,460 | $5,295 |
$38,460
1,168,163
kWh
|
- | |
| 07 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $30,349 | $44,387 |
$30,349
1,147,850
kWh
|
- | |
| 08 | 2.7135: Install occupancy sensors | $828 | $1,691 |
$828
21,403
kWh
|
- | |
| 09 | 2.5123: Reduce fluid flow rates | $1,160 | $5,108 |
$1,160
29,991
kWh
|
- | |
| 10 | 2.3412: Use waste heat to produce steam to drive a steam turbine-generator | $4,802,431 | $12,539,013 |
$4,802,431
59,531,882
kWh
|
- | |
| TOTAL RECOMMENDED | $5,006,210 | $12,606,556 |
$4,923,194
62,864,187
kWh
|
$83,016
-
MMBtu
|
||
| TOTAL IMPLEMENTED | $131,098 | $10,532 |
$48,082
907,147
kWh
|
$83,016
-
MMBtu
|
||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Coal Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs