Assessment Year | 2020 |
---|---|
Principal Product | Non-woven filter media |
NAICS | 333413: Industrial and Commercial Fan and Blower and Air Purification Equipment Manufacturing |
SIC | 3564: Industrial and Commercial Fans and Blowers and Air Purification Equipment |
Sales Range | $10 M to 50M |
# of Employees | 30 |
Plant Area |
118,578
ft2
|
Annual Production | 28,800
thousand feet
|
Production Hrs. Annual | 4,200
hrs
|
Location (State) | North Carolina |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $91,088 | 1,590,428 |
kWh
|
$0.057 |
Electricity Demand | $92,754 | 10,348 |
kW-mo/yr
|
$8.96 |
Electricity Fees | $4,127 | - |
|
- |
Natural Gas | $75,754 | 10,322 |
MMBtu
|
$7.34 |
TOTAL YEARLY COSTS | $263,723 | |||
RECOMMENDED SAVINGS* | $160,716 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | - |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Personnel Changes Savings | Ancillary Material Cost Savings |
---|---|---|---|---|---|---|---|---|---|
01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $13,099 | $20,000 |
$6,208
107,028
kWh
|
$6,891
-
kW-mo/yr
|
- | - | - | |
02 | 2.7135: Install occupancy sensors | $2,488 | $5,708 |
$2,488
42,897
kWh
|
- | - | - | - | |
03 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $192 | $135 |
$159
2,749
kWh
|
$168
-
kW-mo/yr
|
- | $(-120.0) | $(-15.0) | |
04 | 2.3131: Reschedule plant operations or reduce load to avoid peaks | $20,880 | $5,000 | - |
$20,880
-
kW-mo/yr
|
- | - | - | |
05 | 2.3416: Use combined cycle gas turbine generator sets with waste heat boilers connected to turbine exhaust | $124,057 | $600,000 |
$46,400
800,000
kWh
|
$103,200
-
kW-mo/yr
|
$(-25,543.0)
-
MMBtu
|
- | - | |
TOTAL RECOMMENDED | $160,716 | $630,843 |
$55,255
952,674
kWh
|
$131,139
-
kW-mo/yr
|
$(-25,543.0)
-
MMBtu
|
$(-120.0) | $(-15.0) | ||
TOTAL IMPLEMENTED | - | - | - | - | - | - | - |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs