ITAC Assessment: NC0647
ITAC logo
ITAC Assessment: NC0647
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2020
Principal Product Non-woven filter media
NAICS 333413: Industrial and Commercial Fan and Blower and Air Purification Equipment Manufacturing
SIC 3564: Industrial and Commercial Fans and Blowers and Air Purification Equipment
Sales Range $10
M
to 50
M
# of Employees 30
Plant Area 118,578
ft2
Annual Production 28,800
thousand feet
Production Hrs. Annual 4,200
hrs
Location (State) North Carolina

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $91,088 1,590,428
kWh
Electricity Demand $92,754 10,348
kW-mo/yr
Electricity Fees $4,127 -
Natural Gas $75,754 10,322
MMBtu
TOTAL YEARLY COSTS $263,723
RECOMMENDED SAVINGS* $160,716 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings Ancillary Material Cost Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $13,099 $20,000 $6,208
107,028
kWh
$6,891
-
kW-mo/yr
- - -
02 2.7135: Install occupancy sensors $2,488 $5,708 $2,488
42,897
kWh
- - - -
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $192 $135 $159
2,749
kWh
$168
-
kW-mo/yr
- $(-120.0) $(-15.0)
04 2.3131: Reschedule plant operations or reduce load to avoid peaks $20,880 $5,000 - $20,880
-
kW-mo/yr
- - -
05 2.3416: Use combined cycle gas turbine generator sets with waste heat boilers connected to turbine exhaust $124,057 $600,000 $46,400
800,000
kWh
$103,200
-
kW-mo/yr
$(-25,543.0)
-
MMBtu
- -
TOTAL RECOMMENDED $160,716 $630,843 $55,255
952,674
kWh
$131,139
-
kW-mo/yr
$(-25,543.0)
-
MMBtu
$(-120.0) $(-15.0)
TOTAL IMPLEMENTED - - - - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs