ITAC Assessment: SF0197
ITAC logo
ITAC Assessment: SF0197
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2000
Principal Product Plastic Pails
NAICS
n/a
SIC 3079:
Sales Range $10
M
to 50
M
# of Employees 96
Plant Area 46,368
ft2
Annual Production 6,000,000
units
Production Hrs. Annual 8,736
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $637,523 11,693,269
kWh
Natural Gas $10,520 1,651
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $90,893 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $31,979

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Solid Waste (non-haz) Savings Administrative Changes Savings
01 3.7392: Apply a protective coating to racks and tanks $1,878 - $1,878
36,048
kWh
- -
02 4.711: Initiate a total quality management program $834 - $834
19,500
kWh
- -
03 2.7135: Install occupancy sensors $7,130 $977 $7,130
166,642
kWh
- -
04 2.4222: Install adequate dryers on air lines to eliminate blowdown $5,706 $2,936 $5,706
133,358
kWh
- -
05 2.7135: Install occupancy sensors $1,053 $600 $1,053
24,601
kWh
- -
06 2.4133: Use most efficient type of electric motors $3,000 $3,333 $3,000
57,441
kWh
- -
07 2.7142: Utilize higher efficiency lamps and/or ballasts $14,489 $22,680 $14,489
338,641
kWh
- -
08 2.4111: Utilize energy-efficient belts and other improved mechanisms $233 $228 $233
4,396
kWh
- -
09 2.7135: Install occupancy sensors $565 $1,500 $565
13,209
kWh
- -
10 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $51,408 $178,376 $51,408
1,201,533
kWh
- -
11 3.5217: Reuse / recycle/ sell paper products $1,800 - - $1,800
-
lb
-
12 2.3212: Optimize plant power factor $2,797 $6,436 - - $2,797
TOTAL RECOMMENDED $90,893 $217,066 $86,296
1,995,369
kWh
$1,800
-
lb
$2,797
TOTAL IMPLEMENTED $31,979 $35,754 $29,182
660,478
kWh
- $2,797
Yearly Savings* Imp'd Cost* Electricity Usage Savings Solid Waste (non-haz) Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs