Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2000
Principal Product Asphalt Roofing Products
NAICS
n/a
SIC 2952: Asphalt Felts and Coatings
Sales Range $1
M
to 5
M
# of Employees 10
Plant Area 44,200
ft2
Annual Production 1,500,000
Tgal
Production Hrs. Annual 6,720
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $25,089 185,280
kWh
Natural Gas $5,528 1,597
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $4,116 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $4,116

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
01 2.2122: Install / repair insulation on condensate lines $648 $860 - $648
-
MMBtu
-
02 2.4222: Install adequate dryers on air lines to eliminate blowdown $67 $287 $67
763
kWh
- -
03 2.7142: Utilize higher efficiency lamps and/or ballasts $1,663 $6,340 $1,663
18,824
kWh
- -
04 2.8112: Combine utility meters $1,738 $60 - - $1,738
TOTAL RECOMMENDED $4,116 $7,547 $1,730
19,587
kWh
$648
-
MMBtu
$1,738
TOTAL IMPLEMENTED $4,116 $7,547 $1,730
19,587
kWh
$648
-
MMBtu
$1,738
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs