ITAC Assessment: UD0244
ITAC logo
ITAC Assessment: UD0244
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1987
Principal Product COMP. RIBBONS & PAPER
NAICS
n/a
SIC 3955: Carbon Paper and Inked Ribbons
Sales Range $10
M
to 50
M
# of Employees 100
Plant Area
n/a
Annual Production 0
units
Production Hrs. Annual 2,880
hrs
Location (State) Ohio

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $187,620 2,347,304
kWh
Natural Gas $64,608 13,716
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $20,375 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $18,010

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
01 2.3131: Reschedule plant operations or reduce load to avoid peaks $1,643 $1,000 $1,643
-
kWh
- -
02 2.7111: Reduce illumination to minimum necessary levels $8,077 $935 $8,217
92,028
kWh
$(-816.0)
-
MMBtu
$676
03 2.7494: Install storm windows and doors $8,290 $3,000 - $8,290
-
MMBtu
-
04 2.2414: Use waste heat from hot flue gases to preheat $2,365 $5,000 - $2,365
-
MMBtu
-
TOTAL RECOMMENDED $20,375 $9,935 $9,860
92,028
kWh
$9,839
-
MMBtu
$676
TOTAL IMPLEMENTED $18,010 $4,935 $9,860
92,028
kWh
$7,474
-
MMBtu
$676
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs