Assessment Year | 1999 |
---|---|
Principal Product | Extrusion Blow Molding Parts |
NAICS |
n/a
|
SIC | 3089: Plastics Products, Not Elsewhere Classified |
Sales Range | $10 M to 50M |
# of Employees | 80 |
Plant Area |
110,000
ft2
|
Annual Production | 6,300,000
lb
|
Production Hrs. Annual | 8,568
hrs
|
Location (State) | California |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $314,449 | 5,896,835 |
kWh
|
$0.053 |
Electricity Demand | $146,984 | 10,818 |
kW-mo/yr
|
$13.59 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $198,634 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $105,900 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Solid Waste (non-haz) Savings | Administrative Changes Savings | Increase in Production Savings |
---|---|---|---|---|---|---|---|---|---|
01 | 2.6231: Utilize controls to operate equipment only when needed | $5,749 | $1,874 |
$5,749
107,855
kWh
|
- | - | - | - | |
02 | 2.4133: Use most efficient type of electric motors | $2,009 | $2,657 |
$1,480
27,843
kWh
|
$529
-
kW-mo/yr
|
- | - | - | |
03 | 2.4231: Reduce the pressure of compressed air to the minimum required | $1,319 | $2,085 |
$972
18,171
kWh
|
$347
-
kW-mo/yr
|
- | - | - | |
04 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $10,319 | $21,700 |
$7,604
142,732
kWh
|
$2,715
-
kW-mo/yr
|
- | - | - | |
05 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $10,299 | $22,605 |
$7,309
137,163
kWh
|
$2,990
-
kW-mo/yr
|
- | - | - | |
06 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $32,535 | $105,940 |
$23,974
449,883
kWh
|
$8,561
-
kW-mo/yr
|
- | - | - | |
07 | 2.7145: Install skylights | $5,224 | $19,968 |
$5,224
97,890
kWh
|
- | - | - | - | |
08 | 2.2511: Insulate bare equipment | $791 | $2,991 |
$791
14,947
kWh
|
- | - | - | - | |
09 | 3.5212: Regrind, reuse, or sell scrap plastic parts | $7,080 | $250 | - | - |
$7,080
-
lb
|
- | - | |
10 | 3.5315: Lease / purchase baler; sell cardboard to recycler | $861 | $250 | - | - |
$861
-
lb
|
- | - | |
11 | 2.2696: Use excess cold process fluid for industrial cooling needs | $55,556 | $17,250 | - | - | - | - | $55,556 | |
12 | 2.8114: Change rate schedules or other changes in utility service | $66,892 | $165,000 | - | - | - | $66,892 | - | |
TOTAL RECOMMENDED | $198,634 | $362,570 |
$53,103
996,484
kWh
|
$15,142
-
kW-mo/yr
|
$7,941
-
lb
|
$66,892 | $55,556 | ||
TOTAL IMPLEMENTED | $105,900 | $133,297 |
$32,966
618,699
kWh
|
$9,437
-
kW-mo/yr
|
$7,941
-
lb
|
- | $55,556 | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Solid Waste (non-haz) Savings | Administrative Changes Savings | Increase in Production Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs