ITAC Assessment: SF0168
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1999
Principal Product Printed Labels
NAICS
n/a
SIC 2759: Commercial Printing, Not Elsewhere Classified
Sales Range $5
M
to 10
M
# of Employees 40
Plant Area 25,000
ft2
Annual Production 4,810
units
Production Hrs. Annual 5,590
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $65,549 507,620
kWh
Natural Gas $3,078 454
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $50,242 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $4,187

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Solid Waste (non-haz) Savings Administrative Changes Savings
01 2.7261: Install timers and/or thermostats $3,158 $1,318 $766
6,448
kWh
$2,392
-
MMBtu
- -
02 2.7135: Install occupancy sensors $547 $1,344 $547
4,689
kWh
- - -
03 2.1311: Replace electrically-operated equipment with fossil fuel equipment $1,661 $4,765 $2,745
23,740
kWh
$(-1,084.0)
-
MMBtu
- -
04 2.1311: Replace electrically-operated equipment with fossil fuel equipment $482 $1,433 $641
5,569
kWh
$(-159.0)
-
MMBtu
- -
05 2.7142: Utilize higher efficiency lamps and/or ballasts $1,532 $4,900 $1,532
13,189
kWh
- - -
06 2.7142: Utilize higher efficiency lamps and/or ballasts $3,403 $12,245 $3,403
29,308
kWh
- - -
07 3.8141: Regenerate cleaning solvent on-site and reuse $17,794 $14,320 $(-351.0)
(-2,931)
kWh
- $18,145
-
lb
-
08 4.652: Replace existing equipment with more suitable substitutes $21,665 $272,034 - - - $21,665
TOTAL RECOMMENDED $50,242 $312,359 $9,283
80,012
kWh
$1,149
-
MMBtu
$18,145
-
lb
$21,665
TOTAL IMPLEMENTED $4,187 $4,095 $1,954
16,706
kWh
$2,233
-
MMBtu
- -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Solid Waste (non-haz) Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs