Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1998
Principal Product Printed Circuit Boards
NAICS
n/a
SIC 3672: Printed Circuit Boards
Sales Range $50
M
to 100
M
# of Employees 95
Plant Area 39,000
ft2
Annual Production 200,000
pieces
Production Hrs. Annual 4,160
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $49,627 721,864
kWh
Electricity Demand $11,961 2,318
kW-mo/yr
Natural Gas $1,708 212
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $207,197 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $203,685

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Solid Waste (non-haz) Savings Administrative Changes Savings
01 2.4231: Reduce the pressure of compressed air to the minimum required $690 $15 $644
9,379
kWh
$46
-
kW-mo/yr
- -
02 2.6218: Turn off equipment when not in use $368 - $368
5,275
kWh
- - -
03 2.6231: Utilize controls to operate equipment only when needed $555 $495 $457
6,741
kWh
$98
-
kW-mo/yr
- -
04 2.7135: Install occupancy sensors $844 $2,640 $643
9,379
kWh
$201
-
kW-mo/yr
- -
05 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $1,333 $5,522 $936
13,482
kWh
$397
-
kW-mo/yr
- -
06 2.7142: Utilize higher efficiency lamps and/or ballasts $5,627 $25,680 $4,544
66,237
kWh
$1,083
-
kW-mo/yr
- -
07 3.5315: Lease / purchase baler; sell cardboard to recycler $780 $145 - - $780
-
lb
-
08 4.126: Install sensors to detect defects $80,000 $40,000 - - - $80,000
09 4.112: Replace old machine with new automatic multi-station tool $117,000 $400,000 - - - $117,000
TOTAL RECOMMENDED $207,197 $474,497 $7,592
110,493
kWh
$1,825
-
kW-mo/yr
$780
-
lb
$197,000
TOTAL IMPLEMENTED $203,685 $465,695 $5,556
80,891
kWh
$1,129
-
kW-mo/yr
- $197,000
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Solid Waste (non-haz) Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs