ITAC Assessment: SF0148
ITAC logo
ITAC Assessment: SF0148
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1998
Principal Product Buses
NAICS
n/a
SIC 3711: Motor Vehicles and Passenger Car Bodies
Sales Range $100
M
to 500
M
# of Employees 450
Plant Area 130,000
ft2
Annual Production 1,000
pieces
Production Hrs. Annual 6,684
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $177,714 2,963,951
kWh
Electricity Demand $98,138 7,622
kW-mo/yr
Natural Gas $119,782 24,151
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $415,308 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $33,438

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Other Liquid (haz) Savings Solid Waste (non-haz) Savings Solid Waste (haz) Savings Administrative Changes Savings Primary Raw Material Savings Ancillary Material Cost Savings
01 2.4154: Avoid rewinding motors more than twice $1,032 $817 $707
4,982
kWh
$325
-
kW-mo/yr
- - - - - - -
02 2.7144: Install spectral reflectors / delamp $1,629 $1,694 $1,068
19,343
kWh
$561
-
kW-mo/yr
- - - - - - -
03 2.1311: Replace electrically-operated equipment with fossil fuel equipment $6,511 $8,195 $6,916
115,182
kWh
$2,035
-
kW-mo/yr
$(-2,440.0)
-
MMBtu
- - - - - -
04 2.7134: Use photocell controls $3,137 $5,250 $2,007
33,411
kWh
$1,130
-
kW-mo/yr
- - - - - - -
05 3.5315: Lease / purchase baler; sell cardboard to recycler $30,063 - - - - - $30,063
-
lb
- - - -
06 3.5313: Increase amount of waste recovered for resale $2,343 - - - - - $2,343
-
lb
- - - -
07 3.5315: Lease / purchase baler; sell cardboard to recycler $21,615 $8,445 - - - - $21,615
-
lb
- - - -
08 3.5314: Use in-process recycling whenever possible $42,174 $120,374 - - - - $29,700
-
lb
- $12,474 - -
09 3.2124: Convert to air assisted / airless paint guns $227,825 $1,214 - - - - - - $33,569 $194,256 -
10 3.1191: Change procedures / equipment / operating conditions $5,903 $70 - - - - - $3,095
-
lb
$2,808 - -
11 3.2124: Convert to air assisted / airless paint guns $73,076 $5,598 - - - $2,129
-
gal
- - $7,584 - $63,363
TOTAL RECOMMENDED $415,308 $151,657 $10,698
172,918
kWh
$4,051
-
kW-mo/yr
$(-2,440.0)
-
MMBtu
$2,129
-
gal
$83,721
-
lb
$3,095
-
lb
$56,435 $194,256 $63,363
TOTAL IMPLEMENTED $33,438 $817 $707
4,982
kWh
$325
-
kW-mo/yr
- - $32,406
-
lb
- - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Other Liquid (haz) Savings Solid Waste (non-haz) Savings Solid Waste (haz) Savings Administrative Changes Savings Primary Raw Material Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs