ITAC Assessment: SF0141
ITAC logo
ITAC Assessment: SF0141
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1998
Principal Product Electronic Wires and Cables
NAICS
n/a
SIC 3357: Drawing and Insulating of Nonferrous Wire
Sales Range $10
M
to 50
M
# of Employees 210
Plant Area 55,000
ft2
Annual Production 650,000
pieces
Production Hrs. Annual 4,680
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $69,174 1,032,532
kWh
Electricity Demand $23,116 4,480
kW-mo/yr
Natural Gas $1,307 192
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $19,900 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $5,362

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings Solid Waste (non-haz) Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $927 - $844
12,603
kWh
$83
-
kW-mo/yr
- - -
02 2.6231: Utilize controls to operate equipment only when needed $231 $204 $193
2,931
kWh
$38
-
kW-mo/yr
- - -
03 2.2136: Install / repair insulation on steam lines $408 $358 - - - $408
-
MMBtu
-
04 2.3212: Optimize plant power factor $1,692 $1,797 - - $1,692 - -
05 2.7135: Install occupancy sensors $2,101 $4,080 $1,656
24,619
kWh
$445
-
kW-mo/yr
- - -
06 2.1311: Replace electrically-operated equipment with fossil fuel equipment $1,436 $3,582 $1,881
28,136
kWh
$372
-
kW-mo/yr
- $(-817.0)
-
MMBtu
-
07 2.7142: Utilize higher efficiency lamps and/or ballasts $6,722 $17,970 $5,633
84,115
kWh
$1,089
-
kW-mo/yr
- - -
08 3.5316: Contract a wood pallet recycling company $2,999 $125 - - - - $2,999
-
lb
09 3.6193: Install equipment (eg compactor) to reduce disposal costs $1,307 - - - - - $1,307
-
lb
10 3.5315: Lease / purchase baler; sell cardboard to recycler $2,077 $9,025 - - - - $2,077
-
lb
TOTAL RECOMMENDED $19,900 $37,141 $10,207
152,404
kWh
$2,027
-
kW-mo/yr
$1,692 $(-409.0)
-
MMBtu
$6,383
-
lb
TOTAL IMPLEMENTED $5,362 $3,707 $2,725
40,739
kWh
$455
-
kW-mo/yr
- $(-817.0)
-
MMBtu
$2,999
-
lb
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings Solid Waste (non-haz) Savings