ITAC Assessment: SF0058
ITAC logo
ITAC Assessment: SF0058
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1995
Principal Product Heat Treated
NAICS
n/a
SIC 3398: Metal Heat Treating
Sales Range $1
M
to 5
M
# of Employees 21
Plant Area 25,000
ft2
Annual Production 10,700,000
lb
Production Hrs. Annual 6,240
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $98,112 1,097,597
kWh
Natural Gas $99,652 31,520
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $24,482 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $2,430

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.4133: Use most efficient type of electric motors $562 $917 $562
6,155
kWh
-
02 2.7142: Utilize higher efficiency lamps and/or ballasts $1,734 $8,540 $1,734
19,343
kWh
-
03 2.4111: Utilize energy-efficient belts and other improved mechanisms $379 $385 $379
4,396
kWh
-
04 2.2437: Recover waste heat from equipment $8,513 $18,500 - $8,513
-
MMBtu
05 2.3212: Optimize plant power factor $1,391 $1,433 $1,391
-
kWh
-
06 2.6218: Turn off equipment when not in use $3,604 - $3,604
40,445
kWh
-
07 2.4226: Use / purchase optimum sized compressor $2,430 $11,500 $2,430
27,550
kWh
-
08 2.2628: Utilize a less expensive cooling method $5,869 $4,703 $5,869
65,651
kWh
-
TOTAL RECOMMENDED $24,482 $45,978 $15,969
163,540
kWh
$8,513
-
MMBtu
TOTAL IMPLEMENTED $2,430 $11,500 $2,430
27,550
kWh
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs