Assessment Year | 1995 |
---|---|
Principal Product | Tallow, Yellow Grease, Meat &Bone Meal |
NAICS |
n/a
|
SIC | 2077: Animal and Marine Fats and Oils |
Sales Range | $10 M to 50M |
# of Employees | 42 |
Plant Area |
5,500
ft2
|
Annual Production | 108,000,000
lb
|
Production Hrs. Annual | 4,680
hrs
|
Location (State) | California |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $285,785 | 2,303,634 |
kWh
|
$0.12 |
Natural Gas | $294,381 | 89,342 |
MMBtu
|
$3.29 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $297,017 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $21,062 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings |
---|---|---|---|---|---|---|
01 | 2.4133: Use most efficient type of electric motors | $1,622 | $1,540 |
$1,622
13,189
kWh
|
- | |
02 | 2.2135: Repair and eliminate steam leaks | $384 | $150 | - |
$384
-
MMBtu
|
|
03 | 2.2136: Install / repair insulation on steam lines | $834 | $576 | - |
$834
-
MMBtu
|
|
04 | 2.2437: Recover waste heat from equipment | $11,243 | $19,840 | - |
$11,243
-
MMBtu
|
|
05 | 2.4224: Upgrade controls on compressors | $18,222 | $2,100 |
$18,222
146,835
kWh
|
- | |
06 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $18,019 | $28,800 |
$18,019
145,369
kWh
|
- | |
07 | 2.3415: Use a fossil fuel engine to cogenerate electricity or motive power; and utilize heat | $243,737 | $345,500 |
$268,650
2,303,634
kWh
|
$(-24,913.0)
-
MMBtu
|
|
08 | 2.3212: Optimize plant power factor | $2,956 | $4,084 |
$2,956
-
kWh
|
- | |
TOTAL RECOMMENDED | $297,017 | $402,590 |
$309,469
2,609,027
kWh
|
$(-12,452.0)
-
MMBtu
|
||
TOTAL IMPLEMENTED | $21,062 | $4,366 |
$19,844
160,024
kWh
|
$1,218
-
MMBtu
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs