ITAC Assessment: SF0045
ITAC logo
ITAC Assessment: SF0045
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1994
Principal Product Roofing Felts
NAICS
n/a
SIC 2952: Asphalt Felts and Coatings
Sales Range $10
M
to 50
M
# of Employees 32
Plant Area 65,000
ft2
Annual Production 75,000
ton
Production Hrs. Annual 8,640
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $157,349 1,660,023
kWh
Natural Gas $72,391 18,538
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $16,534 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $14,193

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.4133: Use most efficient type of electric motors $617 $185 $617
6,448
kWh
-
02 2.7142: Utilize higher efficiency lamps and/or ballasts $576 $761 $576
6,155
kWh
-
03 2.2515: Use optimum thickness insulation $1,262 $773 - $1,262
-
MMBtu
04 2.1213: Direct warmest air to combustion intake $11,628 $9,140 - $11,628
-
MMBtu
05 2.1134: Eliminate leaks in combustible gas lines $386 $300 - $386
-
MMBtu
06 2.2511: Insulate bare equipment $917 $2,200 - $917
-
MMBtu
07 2.4221: Install compressor air intakes in coolest locations $1,148 $380 $1,148
12,016
kWh
-
TOTAL RECOMMENDED $16,534 $13,739 $2,341
24,619
kWh
$14,193
-
MMBtu
TOTAL IMPLEMENTED $14,193 $12,413 - $14,193
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs