Assessment Year | 1993 |
---|---|
Principal Product | Tire Tread Rubber |
NAICS |
n/a
|
SIC | 3011: Tires and Inner Tubes |
Sales Range | $10 M to 50M |
# of Employees | 57 |
Plant Area |
80,000
ft2
|
Annual Production | 10,000
ton
|
Production Hrs. Annual | 5,500
hrs
|
Location (State) | California |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $458,942 | 4,521,688 |
kWh
|
$0.10 |
Natural Gas | $97,361 | 23,619 |
MMBtu
|
$4.12 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $37,290 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $26,350 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings |
---|---|---|---|---|---|---|
01 | 2.4133: Use most efficient type of electric motors | $10,029 | $9,608 |
$10,029
98,769
kWh
|
- | |
02 | 2.2441: Preheat boiler makeup water with waste process heat | $8,821 | $20,000 | - |
$8,821
-
MMBtu
|
|
03 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $7,452 | $1,650 |
$7,452
73,271
kWh
|
- | |
04 | 2.7134: Use photocell controls | $2,119 | $1,068 |
$2,119
20,809
kWh
|
- | |
05 | 2.2511: Insulate bare equipment | $1,767 | $1,062 | - |
$1,767
-
MMBtu
|
|
06 | 2.1233: Analyze flue gas for proper air/fuel ratio | $1,540 | $400 | - |
$1,540
-
MMBtu
|
|
07 | 2.2136: Install / repair insulation on steam lines | $1,416 | $906 | - |
$1,416
-
MMBtu
|
|
08 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,406 | $3,719 |
$1,406
13,775
kWh
|
- | |
09 | 2.4314: Use synthetic lubricant | $1,098 | - |
$1,098
10,844
kWh
|
- | |
10 | 2.4221: Install compressor air intakes in coolest locations | $1,030 | $1,824 |
$1,030
10,258
kWh
|
- | |
11 | 2.2122: Install / repair insulation on condensate lines | $612 | $162 | - |
$612
-
MMBtu
|
|
TOTAL RECOMMENDED | $37,290 | $40,399 |
$23,134
227,726
kWh
|
$14,156
-
MMBtu
|
||
TOTAL IMPLEMENTED | $26,350 | $19,331 |
$21,015
206,917
kWh
|
$5,335
-
MMBtu
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs