ITAC Assessment: SF0015
ITAC logo
ITAC Assessment: SF0015
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1993
Principal Product Tire Tread Rubber
NAICS
n/a
SIC 3011: Tires and Inner Tubes
Sales Range $10
M
to 50
M
# of Employees 57
Plant Area 80,000
ft2
Annual Production 10,000
ton
Production Hrs. Annual 5,500
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $458,942 4,521,688
kWh
Natural Gas $97,361 23,619
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $37,290 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $26,350

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.4133: Use most efficient type of electric motors $10,029 $9,608 $10,029
98,769
kWh
-
02 2.2441: Preheat boiler makeup water with waste process heat $8,821 $20,000 - $8,821
-
MMBtu
03 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $7,452 $1,650 $7,452
73,271
kWh
-
04 2.7134: Use photocell controls $2,119 $1,068 $2,119
20,809
kWh
-
05 2.2511: Insulate bare equipment $1,767 $1,062 - $1,767
-
MMBtu
06 2.1233: Analyze flue gas for proper air/fuel ratio $1,540 $400 - $1,540
-
MMBtu
07 2.2136: Install / repair insulation on steam lines $1,416 $906 - $1,416
-
MMBtu
08 2.7142: Utilize higher efficiency lamps and/or ballasts $1,406 $3,719 $1,406
13,775
kWh
-
09 2.4314: Use synthetic lubricant $1,098 - $1,098
10,844
kWh
-
10 2.4221: Install compressor air intakes in coolest locations $1,030 $1,824 $1,030
10,258
kWh
-
11 2.2122: Install / repair insulation on condensate lines $612 $162 - $612
-
MMBtu
TOTAL RECOMMENDED $37,290 $40,399 $23,134
227,726
kWh
$14,156
-
MMBtu
TOTAL IMPLEMENTED $26,350 $19,331 $21,015
206,917
kWh
$5,335
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs