ITAC Assessment: SF0010
ITAC logo
ITAC Assessment: SF0010
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1993
Principal Product Glass Hard Disks
NAICS
n/a
SIC 3695: Magnetic And Optical Recording Media
Sales Range $10
M
to 50
M
# of Employees 100
Plant Area 60,000
ft2
Annual Production 1,800,000
pieces
Production Hrs. Annual 8,736
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $503,886 5,402,403
kWh
Natural Gas $19,577 3,408
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $81,794 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $15,247

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.2422: Use waste heat from hot flue gases to generate steam $2,532 $5,410 $2,532
27,257
kWh
-
02 2.4221: Install compressor air intakes in coolest locations $700 $130 $700
7,620
kWh
-
03 2.2511: Insulate bare equipment $214 $262 - $214
-
MMBtu
04 2.1311: Replace electrically-operated equipment with fossil fuel equipment $36,892 $31,700 $49,003
525,498
kWh
$(-12,111.0)
-
MMBtu
05 2.7142: Utilize higher efficiency lamps and/or ballasts $4,713 $9,277 $4,713
50,410
kWh
-
06 2.4133: Use most efficient type of electric motors $8,002 $4,553 $8,002
85,873
kWh
-
07 2.8114: Change rate schedules or other changes in utility service $28,741 $60,000 $28,741
-
kWh
-
TOTAL RECOMMENDED $81,794 $111,332 $93,691
696,658
kWh
$(-11,897.0)
-
MMBtu
TOTAL IMPLEMENTED $15,247 $19,240 $15,247
163,540
kWh
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs