Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1994
Principal Product Tortillas, Corn Chips
NAICS
n/a
SIC 2096: Potato Chips, Corn Chips, and Similar Snacks
Sales Range $10
M
to 50
M
# of Employees 147
Plant Area 39,240
ft2
Annual Production 20,600,000
lb
Production Hrs. Annual 8,760
hrs
Location (State) Oregon

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $73,053 1,947,538
kWh
Natural Gas $188,804 45,663
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $11,094 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $971

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.1311: Replace electrically-operated equipment with fossil fuel equipment $9,806 $32,000 $16,341
412,075
kWh
$(-6,535.0)
-
MMBtu
02 2.7142: Utilize higher efficiency lamps and/or ballasts $834 $1,840 $834
26,377
kWh
-
03 2.4133: Use most efficient type of electric motors $137 $317 $137
3,517
kWh
-
04 2.6212: Turn off equipment during breaks, reduce operating time $317 $1,000 $317
11,723
kWh
-
TOTAL RECOMMENDED $11,094 $35,157 $17,629
453,692
kWh
$(-6,535.0)
-
MMBtu
TOTAL IMPLEMENTED $971 $2,157 $971
29,894
kWh
-
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs