| Assessment Year | 2026 |
|---|---|
| Principal Product | Specialized Tool and Die sets |
| NAICS | 333514: Special Die and Tool, Die Set, Jig, and Fixture Manufacturing |
| SIC | 3544: Special Dies and Tools, Die Sets, Jigs and Fixtures, and Industrial Molds |
| Sales Range | $5 M to 10M |
| # of Employees | 23 |
| Plant Area |
10,000
ft2
|
| Annual Production | 1,000,000
units
|
| Production Hrs. Annual | 5,610
hrs
|
| Location (State) | California |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $121,690 | 698,248 |
kWh
|
$0.17 |
| Electricity Demand | $111,239 | 1,592 |
kW-mo/yr
|
$69.86 |
| Electricity Fees | $2,619 | - |
|
- |
| TOTAL YEARLY COSTS | $235,548 | |||
| RECOMMENDED SAVINGS* | $249,771 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | - | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings |
|---|---|---|---|---|---|---|
| 01 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $92 | $169 |
$54
307
kWh
|
$38
-
kW-mo/yr
|
|
| 02 | 2.4231: Reduce the pressure of compressed air to the minimum required | $3,075 | - |
$3,075
17,640
kWh
|
- | |
| 03 | 2.9114: Use solar heat to make electricty | $79,930 | $100,757 |
$29,631
170,000
kWh
|
$50,299
-
kW-mo/yr
|
|
| 04 | 2.3141: Use battery storage for demand control | $77,444 | $42,200 |
$(-2,196.2)
(-12,600)
kWh
|
$79,640
-
kW-mo/yr
|
|
| 05 | 2.6225: Eliminate third shift | $12,209 | - |
$8,244
47,295
kWh
|
$3,965
-
kW-mo/yr
|
|
| 06 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $3,523 | $11,400 |
$1,897
10,881
kWh
|
$1,626
-
kW-mo/yr
|
|
| 07 | 2.4223: Install direct acting units in place of compressed air pressure system in safety system | $17,287 | $12,600 |
$17,287
99,177
kWh
|
- | |
| 08 | 2.4221: Install compressor air intakes in coolest locations | $3,026 | $1,675 |
$1,629
9,350
kWh
|
$1,397
-
kW-mo/yr
|
|
| 09 | 2.4221: Install compressor air intakes in coolest locations | $10,897 | $1,675 |
$5,867
33,660
kWh
|
$5,030
-
kW-mo/yr
|
|
| 10 | 2.4133: Use most efficient type of electric motors | $11,501 | $7,751 |
$6,192
35,528
kWh
|
$5,309
-
kW-mo/yr
|
|
| 11 | 2.3131: Reschedule plant operations or reduce load to avoid peaks | $30,787 | - | - |
$30,787
-
kW-mo/yr
|
|
| TOTAL RECOMMENDED | $249,771 | $178,227 |
$71,679
411,239
kWh
|
$178,092
-
kW-mo/yr
|
||
| TOTAL IMPLEMENTED | - | - | - | - | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs