ITAC Assessment: UM0012
ITAC logo
ITAC Assessment: UM0012
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1994
Principal Product Plastic Bags and Films
NAICS
n/a
SIC 3081: Unsupported Plastics Film and Sheet
Sales Range $5
M
to 10
M
# of Employees 45
Plant Area 56,000
ft2
Annual Production 6,000,000
lb
Production Hrs. Annual 6,000
hrs
Location (State) Michigan

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $122,240 2,068,875
kWh
Natural Gas $15,598 3,820
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $12,451 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $6,406

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.4133: Use most efficient type of electric motors $2,061 $2,890 $2,061
34,877
kWh
-
02 2.7142: Utilize higher efficiency lamps and/or ballasts $1,236 $4,084 $1,236
21,102
kWh
-
03 2.7231: Use radiant heater for spot heating $2,542 $6,800 - $2,542
-
MMBtu
04 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $1,273 $1,600 $1,273
21,688
kWh
-
05 2.7243: Improve air circulation with destratification fans / other methods $2,888 $2,000 - $2,888
-
MMBtu
06 2.1311: Replace electrically-operated equipment with fossil fuel equipment $615 $500 $807
13,775
kWh
$(-192.0)
-
MMBtu
07 2.7221: Lower temperature during the winter season and vice-versa $1,836 - - $1,836
-
MMBtu
TOTAL RECOMMENDED $12,451 $17,874 $5,377
91,442
kWh
$7,074
-
MMBtu
TOTAL IMPLEMENTED $6,406 $8,574 $4,570
77,667
kWh
$1,836
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs