ITAC Assessment: SF0193
ITAC logo
ITAC Assessment: SF0193
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2000
Principal Product Sheet Metal
NAICS
n/a
SIC 3444: Sheet Metal Work
Sales Range $10
M
to 50
M
# of Employees 100
Plant Area 110,000
ft2
Annual Production 10,000,000
pieces
Production Hrs. Annual 4,550
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $73,668 894,600
kWh
Natural Gas $75,917 15,413
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $38,286 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $2,201

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Solid Waste (non-haz) Savings
01 2.1135: Repair furnaces and oven doors so that they seal efficiently $11,245 $3,224 - - $11,245
-
MMBtu
-
02 2.2428: Use flue gases in radiant heater for space heating, ovens, etc $8,529 $3,300 - - $8,529
-
MMBtu
-
03 2.7132: Install timers on light switches in little used areas $1,643 $2,128 $1,447
15,200
kWh
$196
-
kW-mo/yr
- -
04 2.4111: Utilize energy-efficient belts and other improved mechanisms $2,402 $5,673 $2,028
20,090
kWh
$374
-
kW-mo/yr
- -
05 2.4133: Use most efficient type of electric motors $3,316 $6,961 $2,981
21,978
kWh
$335
-
kW-mo/yr
- -
06 2.7142: Utilize higher efficiency lamps and/or ballasts $2,201 $9,000 $1,900
19,436
kWh
$301
-
kW-mo/yr
- -
07 3.6111: Use alternative flocculent to minimize sludge volume $8,950 $16,000 - - - $8,950
-
lb
TOTAL RECOMMENDED $38,286 $46,286 $8,356
76,704
kWh
$1,206
-
kW-mo/yr
$19,774
-
MMBtu
$8,950
-
lb
TOTAL IMPLEMENTED $2,201 $9,000 $1,900
19,436
kWh
$301
-
kW-mo/yr
- -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Solid Waste (non-haz) Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs