| Assessment Year | 2026 |
|---|---|
| Principal Product | Engine blades and disks |
| NAICS | 336412: Aircraft Engine and Engine Parts Manufacturing |
| SIC | 3724: Aircraft Engines and Engine Parts |
| Sales Range | $50 M to 100M |
| # of Employees | 366 |
| Plant Area |
160,000
ft2
|
| Annual Production | 55,000
units
|
| Production Hrs. Annual | 7,200
hrs
|
| Location (State) | California |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $584,251 | 3,523,049 |
kWh
|
$0.17 |
| Electricity Demand | $665,304 | 10,282 |
kW-mo/yr
|
$64.71 |
| Electricity Fees | $5,026 | - |
|
- |
| TOTAL YEARLY COSTS | $1,254,581 | |||
| RECOMMENDED SAVINGS* | $5,920,199 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | - | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Water Usage Savings | Ancillary Material Cost Savings |
|---|---|---|---|---|---|---|---|---|
| 01 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $169,677 | $26,436 |
$102,805
620,051
kWh
|
$66,872
-
kW-mo/yr
|
- | - | |
| 02 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $168 | $254 |
$102
615
kWh
|
$66
-
kW-mo/yr
|
- | - | |
| 03 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $46,564 | $46,160 |
$28,212
170,160
kWh
|
$18,352
-
kW-mo/yr
|
- | - | |
| 04 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $7,437 | $10,800 |
$4,775
28,798
kWh
|
$2,662
-
kW-mo/yr
|
- | - | |
| 05 | 2.9114: Use solar heat to make electricty | $3,672,174 | $4,969,681 |
$1,384,158
8,348,360
kWh
|
$2,288,016
-
kW-mo/yr
|
- | - | |
| 06 | 2.3141: Use battery storage for demand control | $884,812 | $1,273,750 |
$(-37,305.0)
(-225,000)
kWh
|
$922,117
-
kW-mo/yr
|
- | - | |
| 07 | 2.4231: Reduce the pressure of compressed air to the minimum required | $95,152 | - |
$95,152
573,893
kWh
|
- | - | - | |
| 08 | 4.212: Adopt in-house material generation | $361,127 | $464,200 |
$(-87,433.0)
(-527,342)
kWh
|
- | - | $448,560 | |
| 09 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $5,480 | $2,885 |
$2,816
16,986
kWh
|
$2,664
-
kW-mo/yr
|
- | - | |
| 10 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $6,467 | $6,752 |
$3,918
23,633
kWh
|
$2,549
-
kW-mo/yr
|
- | - | |
| 11 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $19,402 | $15,192 |
$11,755
70,900
kWh
|
$7,647
-
kW-mo/yr
|
- | - | |
| 12 | 2.7234: Use heat pump for space conditioning | $292,020 | $114,400 |
$201,944
1,218,000
kWh
|
$90,076
-
kW-mo/yr
|
- | - | |
| 13 | 2.4221: Install compressor air intakes in coolest locations | $279,031 | $9,550 |
$52,287
315,360
kWh
|
$226,744
-
kW-mo/yr
|
- | - | |
| 14 | 2.2695: Use cascade system of recirculating during cold weather to avoid sub-cooling | $18,033 | $2,250 | - | - |
$18,033
-
Tgal
|
- | |
| 15 | 2.4133: Use most efficient type of electric motors | $62,655 | $56,920 |
$30,702
185,174
kWh
|
$31,953
-
kW-mo/yr
|
- | - | |
| TOTAL RECOMMENDED | $5,920,199 | $6,999,230 |
$1,793,888
10,819,588
kWh
|
$3,659,718
-
kW-mo/yr
|
$18,033
-
Tgal
|
$448,560 | ||
| TOTAL IMPLEMENTED | - | - | - | - | - | - | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Water Usage Savings | Ancillary Material Cost Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs