ITAC Assessment: MS0083
ITAC logo
ITAC Assessment: MS0083
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1997
Principal Product absorbants and turf enhancements
NAICS
n/a
SIC 3295: Minerals and Earths, Ground or Otherwise Treated
Sales Range $10
M
to 50
M
# of Employees 56
Plant Area 120,000
ft2
Annual Production 85,000
ton
Production Hrs. Annual 6,240
hrs
Location (State) Mississippi

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $193,255 5,723,623
kWh
Electricity Demand $97,891 11,899
kW-mo/yr
Electricity Fees $4,505 -
Natural Gas $897,661 272,845
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $611,357 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $9,737

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Other Liquid (haz) Savings Increase in Production Savings
01 2.4314: Use synthetic lubricant $2,061 $200 $1,320
41,911
kWh
$741
-
kW-mo/yr
- - -
02 2.2427: Use waste heat from hot flue gases to preheat incoming fluids $118,026 $75,928 - - $118,026
-
MMBtu
- -
03 2.2511: Insulate bare equipment $9,737 $12,878 - - $9,737
-
MMBtu
- -
04 3.6124: Burn waste oil for heat $1,022 $1,995 $857
13,482
kWh
- - $165
-
gal
-
05 3.5313: Increase amount of waste recovered for resale $480,511 $9,400 - - - - $480,511
TOTAL RECOMMENDED $611,357 $100,401 $2,177
55,393
kWh
$741
-
kW-mo/yr
$127,763
-
MMBtu
$165
-
gal
$480,511
TOTAL IMPLEMENTED $9,737 $12,878 - - $9,737
-
MMBtu
- -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs