ITAC Assessment: SD0659
ITAC logo
ITAC Assessment: SD0659
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2024
Principal Product Plastic Bottles
NAICS 326160: Plastics Bottle Manufacturing
SIC 3085: Plastics Bottles
Sales Range $10
M
to 50
M
# of Employees 95
Plant Area 292,000
ft2
Annual Production 884,000,000
pieces
Production Hrs. Annual 8,568
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $4,265,763 32,575,063
kWh
Electricity Demand $1,234,495 68,496
kW-mo/yr
Natural Gas $44,809 2,394
MMBtu
TOTAL YEARLY COSTS $5,545,067
RECOMMENDED SAVINGS* $802,666 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Ancillary Material Cost Savings
01 2.9114: Use solar heat to make electricty $150,247 $333,540 $94,937
724,710
kWh
$55,310
-
kW-mo/yr
-
02 2.3141: Use battery storage for demand control $48,096 - $(-12,091.0)
(-92,295)
kWh
$60,187
-
kW-mo/yr
-
03 2.7142: Utilize higher efficiency lamps and/or ballasts $86,343 $34,702 $71,599
546,559
kWh
$14,146
-
kW-mo/yr
$598
04 2.2449: Recover heat from exhausted steam, hot air or hot water $78,160 $16,180 $65,528
500,217
kWh
$12,632
-
kW-mo/yr
-
05 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $2,955 $2,109 $2,398
18,303
kWh
$557
-
kW-mo/yr
-
06 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $5,742 $3,181 $4,815
36,752
kWh
$927
-
kW-mo/yr
-
07 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $86,038 $57,435 $72,140
550,688
kWh
$13,898
-
kW-mo/yr
-
08 2.4231: Reduce the pressure of compressed air to the minimum required $42,562 - $42,562
324,901
kWh
- -
09 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $4,401 $2,880 $3,691
28,168
kWh
$711
-
kW-mo/yr
-
10 2.4239: Eliminate or reduce compressed air usage $2,080 $3,360 $2,080
15,879
kWh
- -
11 2.4231: Reduce the pressure of compressed air to the minimum required $53,887 $3,345 $53,887
411,350
kWh
- -
12 2.4231: Reduce the pressure of compressed air to the minimum required $56,412 $3,345 $56,412
430,629
kWh
- -
13 2.4221: Install compressor air intakes in coolest locations $55,674 $3,278 $46,680
356,339
kWh
$8,993
-
kW-mo/yr
-
14 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $130,069 $201,000 $93,372
712,760
kWh
$36,697
-
kW-mo/yr
-
TOTAL RECOMMENDED $802,666 $664,355 $598,009
4,564,960
kWh
$204,059
-
kW-mo/yr
$598
TOTAL IMPLEMENTED - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs