ITAC Assessment: SD0656
ITAC logo
ITAC Assessment: SD0656
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2024
Principal Product Electronic Cable Connectors
NAICS 334417: Electronic Connector Manufacturing
SIC 3678: Electronic Connectors
Sales Range $10
M
to 50
M
# of Employees 112
Plant Area 33,000
ft2
Annual Production 20,000
units
Production Hrs. Annual 4,896
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $203,151 512,790
kWh
Electricity Demand $60,779 1,131
kW-mo/yr
Natural Gas $13,086 593
MMBtu
Waste Disposal Costs
Water Disposal $48,000 9,000
Tgal
TOTAL YEARLY COSTS $325,016
RECOMMENDED SAVINGS* $242,854 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Water Disposal Savings
01 2.4133: Use most efficient type of electric motors $13,203 $18,032 $8,308
20,970
kWh
$4,895
-
kW-mo/yr
-
02 2.9114: Use solar heat to make electricty $49,836 $74,485 $31,657
79,901
kWh
$18,179
-
kW-mo/yr
-
03 2.3141: Use battery storage for demand control $54,943 $3,087 $(-9,359.0)
(-23,625)
kWh
$64,302
-
kW-mo/yr
-
04 2.4223: Install direct acting units in place of compressed air pressure system in safety system $54,151 $15,130 $54,151
136,677
kWh
- -
05 2.2223: Enhance sensitivity of temperature control and cutoff $2,144 $2,200 $1,755
4,430
kWh
$389
-
kW-mo/yr
-
06 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $10,164 $2,109 $7,423
18,737
kWh
$2,741
-
kW-mo/yr
-
07 2.7142: Utilize higher efficiency lamps and/or ballasts $1,422 $2,040 $1,082
2,731
kWh
$340
-
kW-mo/yr
-
08 2.4231: Reduce the pressure of compressed air to the minimum required $3,188 $500 $3,188
8,046
kWh
- -
09 3.8113: Prevent excessive solvent usage (operator training) $35,678 $51,900 - - $35,678
-
Tgal
10 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $3,299 $3,896 $2,237
5,646
kWh
$1,062
-
kW-mo/yr
-
11 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $5,784 $2,109 $4,341
10,957
kWh
$1,443
-
kW-mo/yr
-
12 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $9,042 $11,447 $6,830
17,240
kWh
$2,212
-
kW-mo/yr
-
TOTAL RECOMMENDED $242,854 $186,935 $111,613
281,710
kWh
$95,563
-
kW-mo/yr
$35,678
-
Tgal
TOTAL IMPLEMENTED - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Water Disposal Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs