Assessment Year | 2023 |
---|---|
Principal Product | Precision Machining (CNC) Services |
NAICS | 332710: Machine Shops |
SIC | 3599: Industrial and Commercial Machinery and Equipment, Not Elsewhere Classified |
Sales Range | $5 M to 10M |
# of Employees | 38 |
Plant Area |
12,800
ft2
|
Annual Production | 140,000
units
|
Production Hrs. Annual | 4,080
hrs
|
Location (State) | California |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | ||
---|---|---|---|---|---|
Electricity Usage | $53,531 | 480,777 |
kWh
|
$0.11 | |
Electricity Demand | $41,837 | 1,218 |
kW-mo/yr
|
$34.35 | |
Electricity Fees | $14,954 | - |
|
- | |
Waste Disposal Costs | |||||
Other Liquid (haz) | $18,000 | 660 |
gal
|
$27.27 | |
TOTAL YEARLY COSTS | $128,322 | ||||
RECOMMENDED SAVINGS* | $78,597 |
See individual recommendations below
*Non-energy impacts included in savings.
|
|||
IMPLEMENTED SAVINGS* | $78,597 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Other Liquid (haz) Savings | Personnel Changes Savings |
---|---|---|---|---|---|---|---|---|
01 | 3.8113: Prevent excessive solvent usage (operator training) | $11,699 | $6,300 | - | - |
$11,699
-
gal
|
- | |
02 | 2.9114: Use solar heat to make electricty | $49,059 | $77,697 |
$21,854
196,350
kWh
|
$27,205
-
kW-mo/yr
|
- | - | |
03 | 2.4223: Install direct acting units in place of compressed air pressure system in safety system | $4,401 | $6,200 |
$4,401
39,546
kWh
|
- | - | - | |
04 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $2,191 | $8,424 |
$1,044
9,381
kWh
|
$1,131
-
kW-mo/yr
|
- | $16 | |
05 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $440 | $570 |
$255
2,295
kWh
|
$185
-
kW-mo/yr
|
- | - | |
06 | 2.4133: Use most efficient type of electric motors | $641 | $1,749 |
$366
3,290
kWh
|
$275
-
kW-mo/yr
|
- | - | |
07 | 2.3141: Use battery storage for demand control | $9,071 | $1,121 |
$(-2,573.0)
(-23,112)
kWh
|
$11,644
-
kW-mo/yr
|
- | - | |
08 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $1,095 | $3,366 |
$635
5,707
kWh
|
$460
-
kW-mo/yr
|
- | - | |
TOTAL RECOMMENDED | $78,597 | $105,427 |
$25,982
233,457
kWh
|
$40,900
-
kW-mo/yr
|
$11,699
-
gal
|
$16 | ||
TOTAL IMPLEMENTED | $78,597 | $105,427 |
$25,982
233,457
kWh
|
$40,900
-
kW-mo/yr
|
$11,699
-
gal
|
$16 | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Other Liquid (haz) Savings | Personnel Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs