ITAC Assessment: SD0640
ITAC logo
ITAC Assessment: SD0640
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2023
Principal Product Precision Machining (CNC) Services
NAICS 332710: Machine Shops
SIC 3599: Industrial and Commercial Machinery and Equipment, Not Elsewhere Classified
Sales Range $5
M
to 10
M
# of Employees 38
Plant Area 12,800
ft2
Annual Production 140,000
units
Production Hrs. Annual 4,080
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $53,531 480,777
kWh
Electricity Demand $41,837 1,218
kW-mo/yr
Electricity Fees $14,954 -
Waste Disposal Costs
Other Liquid (haz) $18,000 660
gal
TOTAL YEARLY COSTS $128,322
RECOMMENDED SAVINGS* $78,597 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $78,597

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Other Liquid (haz) Savings Personnel Changes Savings
01 3.8113: Prevent excessive solvent usage (operator training) $11,699 $6,300 - - $11,699
-
gal
-
02 2.9114: Use solar heat to make electricty $49,059 $77,697 $21,854
196,350
kWh
$27,205
-
kW-mo/yr
- -
03 2.4223: Install direct acting units in place of compressed air pressure system in safety system $4,401 $6,200 $4,401
39,546
kWh
- - -
04 2.7142: Utilize higher efficiency lamps and/or ballasts $2,191 $8,424 $1,044
9,381
kWh
$1,131
-
kW-mo/yr
- $16
05 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $440 $570 $255
2,295
kWh
$185
-
kW-mo/yr
- -
06 2.4133: Use most efficient type of electric motors $641 $1,749 $366
3,290
kWh
$275
-
kW-mo/yr
- -
07 2.3141: Use battery storage for demand control $9,071 $1,121 $(-2,573.0)
(-23,112)
kWh
$11,644
-
kW-mo/yr
- -
08 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $1,095 $3,366 $635
5,707
kWh
$460
-
kW-mo/yr
- -
TOTAL RECOMMENDED $78,597 $105,427 $25,982
233,457
kWh
$40,900
-
kW-mo/yr
$11,699
-
gal
$16
TOTAL IMPLEMENTED $78,597 $105,427 $25,982
233,457
kWh
$40,900
-
kW-mo/yr
$11,699
-
gal
$16
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Other Liquid (haz) Savings Personnel Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs