Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2023
Principal Product Electronic Components, Circuit boards, Industrial Wiring
NAICS 334418: Printed Circuit Assembly (Electronic Assembly) Manufacturing
SIC 3679: Electronic Components, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 70
Plant Area 12,000
ft2
Annual Production 100,000
units
Production Hrs. Annual 4,400
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $47,088 315,984
kWh
Electricity Demand $63,586 1,148
kW-mo/yr
Electricity Fees $2,941 -
Natural Gas $7,582 471
MMBtu
TOTAL YEARLY COSTS $121,197
RECOMMENDED SAVINGS* $158,333 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $3,338

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.4231: Reduce the pressure of compressed air to the minimum required $283 $250 $283
1,896
kWh
- -
02 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $665 $2,159 $293
1,969
kWh
$372
-
kW-mo/yr
-
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,393 $700 $617
4,140
kWh
$776
-
kW-mo/yr
-
04 2.1311: Replace electrically-operated equipment with fossil fuel equipment $6,593 $8,642 $2,567
17,230
kWh
$5,209
-
kW-mo/yr
$(-1,182.5)
-
MMBtu
05 2.9114: Use solar heat to make electricty $65,827 $115,927 $23,937
160,650
kWh
$41,890
-
kW-mo/yr
-
06 2.3141: Use battery storage for demand control $53,597 - $(-3,254.0)
(-21,838)
kWh
$56,851
-
kW-mo/yr
-
07 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $788 $1,660 $391
2,626
kWh
$397
-
kW-mo/yr
-
08 2.3134: Shift from daytime to nighttime operation $1,662 - - $1,662
-
kW-mo/yr
-
09 2.4223: Install direct acting units in place of compressed air pressure system in safety system $1,900 $2,000 $1,900
12,754
kWh
- -
10 2.7233: Use properly designed and sized hvac equipment $25,625 $49,475 $10,465
70,236
kWh
$15,160
-
kW-mo/yr
-
TOTAL RECOMMENDED $158,333 $180,813 $37,199
249,663
kWh
$122,317
-
kW-mo/yr
$(-1,182.5)
-
MMBtu
TOTAL IMPLEMENTED $3,338 $950 $900
6,036
kWh
$2,438
-
kW-mo/yr
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs