ITAC Assessment: SD0634
ITAC logo
ITAC Assessment: SD0634
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2023
Principal Product Flexographic Labels
NAICS 323111: Commercial Printing (except Screen and Books)
SIC 2752: Commercial Printing, Lithographic
Sales Range $5
M
to 10
M
# of Employees 20
Plant Area 10,000
ft2
Annual Production 1,000,000
units
Production Hrs. Annual 4,325
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $36,709 340,608
kWh
Electricity Demand $54,039 1,621
kW-mo/yr
Electricity Fees $9,332 -
TOTAL YEARLY COSTS $100,080
RECOMMENDED SAVINGS* $75,816 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $75,816

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings
01 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $942 $3,568 $465
4,313
kWh
$477
-
kW-mo/yr
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,518 $700 $680
6,310
kWh
$838
-
kW-mo/yr
03 2.7228: Avoid introducing hot, humid, or dirty air into hvac system $2,222 $2,580 $730
6,768
kWh
$1,492
-
kW-mo/yr
04 2.7233: Use properly designed and sized hvac equipment $4,998 $15,050 $1,860
17,254
kWh
$3,138
-
kW-mo/yr
05 2.9114: Use solar heat to make electricty $49,771 $108,198 $16,164
149,940
kWh
$33,607
-
kW-mo/yr
06 2.7425: Clean or color roof to reduce solar load $15,780 $11,100 $8,105
75,190
kWh
$7,675
-
kW-mo/yr
07 2.4224: Upgrade controls on compressors $585 $250 $585
5,432
kWh
-
TOTAL RECOMMENDED $75,816 $141,446 $28,589
265,207
kWh
$47,227
-
kW-mo/yr
TOTAL IMPLEMENTED $75,816 $141,446 $28,589
265,207
kWh
$47,227
-
kW-mo/yr
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs