| Assessment Year | 2023 |
|---|---|
| Principal Product | Flexographic Labels |
| NAICS | 323111: Commercial Printing (except Screen and Books) |
| SIC | 2752: Commercial Printing, Lithographic |
| Sales Range | $5 M to 10M |
| # of Employees | 20 |
| Plant Area |
10,000
ft2
|
| Annual Production | 1,000,000
units
|
| Production Hrs. Annual | 4,325
hrs
|
| Location (State) | California |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $36,709 | 340,608 |
kWh
|
$0.11 |
| Electricity Demand | $54,039 | 1,621 |
kW-mo/yr
|
$33.34 |
| Electricity Fees | $9,332 | - |
|
- |
| TOTAL YEARLY COSTS | $100,080 | |||
| RECOMMENDED SAVINGS* | $75,816 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $75,816 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings |
|---|---|---|---|---|---|---|
| 01 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $942 | $3,568 |
$465
4,313
kWh
|
$477
-
kW-mo/yr
|
|
| 02 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $1,518 | $700 |
$680
6,310
kWh
|
$838
-
kW-mo/yr
|
|
| 03 | 2.7228: Avoid introducing hot, humid, or dirty air into hvac system | $2,222 | $2,580 |
$730
6,768
kWh
|
$1,492
-
kW-mo/yr
|
|
| 04 | 2.7233: Use properly designed and sized hvac equipment | $4,998 | $15,050 |
$1,860
17,254
kWh
|
$3,138
-
kW-mo/yr
|
|
| 05 | 2.9114: Use solar heat to make electricty | $49,771 | $108,198 |
$16,164
149,940
kWh
|
$33,607
-
kW-mo/yr
|
|
| 06 | 2.7425: Clean or color roof to reduce solar load | $15,780 | $11,100 |
$8,105
75,190
kWh
|
$7,675
-
kW-mo/yr
|
|
| 07 | 2.4224: Upgrade controls on compressors | $585 | $250 |
$585
5,432
kWh
|
- | |
| TOTAL RECOMMENDED | $75,816 | $141,446 |
$28,589
265,207
kWh
|
$47,227
-
kW-mo/yr
|
||
| TOTAL IMPLEMENTED | $75,816 | $141,446 |
$28,589
265,207
kWh
|
$47,227
-
kW-mo/yr
|
||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs