ITAC Assessment: SD0623
ITAC logo
ITAC Assessment: SD0623
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2023
Principal Product powder coating
NAICS 332812: Metal Coating, Engraving (except Jewelry and Silverware), and Allied Services to Manufacturers
SIC 3479: Coating, Engraving, and Allied Services, Not Elsewhere Classified
Sales Range $1
M
to 5
M
# of Employees 15
Plant Area 15,000
ft2
Annual Production 40,000
units
Production Hrs. Annual 2,125
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $27,279 157,089
kWh
Electricity Demand $17,637 2,810
kW-mo/yr
Electricity Fees $6,217 -
Natural Gas $45,771 2,329
MMBtu
Waste Disposal Costs
Other Liquid (haz) $237,500 2,500
gal
TOTAL YEARLY COSTS $334,404
RECOMMENDED SAVINGS* $104,890 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $56,137

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Other Liquid (haz) Savings
01 3.8113: Prevent excessive solvent usage (operator training) $49,875 - - - - $49,875
-
gal
02 2.9114: Use solar heat to make electricty $43,378 $245,406 $36,025
207,400
kWh
$7,353
-
kW-mo/yr
- -
03 2.6212: Turn off equipment during breaks, reduce operating time $6,262 $500 - - $6,262
-
MMBtu
-
04 2.4224: Upgrade controls on compressors $2,157 $6,534 $2,157
12,419
kWh
- - -
05 2.2414: Use waste heat from hot flue gases to preheat $3,218 $7,000 - - $3,218
-
MMBtu
-
TOTAL RECOMMENDED $104,890 $259,440 $38,182
219,819
kWh
$7,353
-
kW-mo/yr
$9,480
-
MMBtu
$49,875
-
gal
TOTAL IMPLEMENTED $56,137 $500 - - $6,262
-
MMBtu
$49,875
-
gal
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs