ITAC Assessment: MA0685
ITAC logo
ITAC Assessment: MA0685
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2011
Principal Product Overhaul and repair of industrial gas turbines
NAICS 336412: Aircraft Engine and Engine Parts Manufacturing
SIC 3724: Aircraft Engines and Engine Parts
Sales Range $50
M
to 100
M
# of Employees 153
Plant Area 150,000
ft2
Annual Production 100
pieces
Production Hrs. Annual 4,160
hrs
Location (State) Connecticut

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $150,334 1,222,876
kWh
Electricity Demand $55,451 3,861
kW-mo/yr
Natural Gas $50,390 6,146
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $16,479 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $6,233

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $5,634 $7,050 $5,634
45,812
kWh
- -
02 2.3131: Reschedule plant operations or reduce load to avoid peaks $3,714 - - $3,714
-
kW-mo/yr
-
03 2.3212: Optimize plant power factor $3,520 $9,425 - $3,520
-
kW-mo/yr
-
04 2.7314: Reduce ventilation air $2,713 $6,300 $1,542
12,542
kWh
- $1,171
-
MMBtu
05 2.7135: Install occupancy sensors $898 $1,280 $898
7,300
kWh
- -
TOTAL RECOMMENDED $16,479 $24,055 $8,074
65,654
kWh
$7,234
-
kW-mo/yr
$1,171
-
MMBtu
TOTAL IMPLEMENTED $6,233 $15,725 $1,542
12,542
kWh
$3,520
-
kW-mo/yr
$1,171
-
MMBtu
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs