Assessment Year | 2011 |
---|---|
Principal Product | Overhaul and repair of industrial gas turbines |
NAICS | 336412: Aircraft Engine and Engine Parts Manufacturing |
SIC | 3724: Aircraft Engines and Engine Parts |
Sales Range | $50 M to 100M |
# of Employees | 153 |
Plant Area |
150,000
ft2
|
Annual Production | 100
pieces
|
Production Hrs. Annual | 4,160
hrs
|
Location (State) | Connecticut |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $150,334 | 1,222,876 |
kWh
|
$0.12 |
Electricity Demand | $55,451 | 3,861 |
kW-mo/yr
|
$14.36 |
Natural Gas | $50,390 | 6,146 |
MMBtu
|
$8.20 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $16,479 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $6,233 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
---|---|---|---|---|---|---|---|
01 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $5,634 | $7,050 |
$5,634
45,812
kWh
|
- | - | |
02 | 2.3131: Reschedule plant operations or reduce load to avoid peaks | $3,714 | - | - |
$3,714
-
kW-mo/yr
|
- | |
03 | 2.3212: Optimize plant power factor | $3,520 | $9,425 | - |
$3,520
-
kW-mo/yr
|
- | |
04 | 2.7314: Reduce ventilation air | $2,713 | $6,300 |
$1,542
12,542
kWh
|
- |
$1,171
-
MMBtu
|
|
05 | 2.7135: Install occupancy sensors | $898 | $1,280 |
$898
7,300
kWh
|
- | - | |
TOTAL RECOMMENDED | $16,479 | $24,055 |
$8,074
65,654
kWh
|
$7,234
-
kW-mo/yr
|
$1,171
-
MMBtu
|
||
TOTAL IMPLEMENTED | $6,233 | $15,725 |
$1,542
12,542
kWh
|
$3,520
-
kW-mo/yr
|
$1,171
-
MMBtu
|
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs