ITAC Assessment: SD0614
ITAC logo
ITAC Assessment: SD0614
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2021
Principal Product plastic components
NAICS 326199: All Other Plastics Product Manufacturing
SIC 3089: Plastics Products, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 230
Plant Area 72,000
ft2
Annual Production 1,000,000,000
units
Production Hrs. Annual 8,736
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $420,757 4,422,950
kWh
Electricity Demand $293,288 8,986
kW-mo/yr
Electricity Fees $30,611 -
TOTAL YEARLY COSTS $744,656
RECOMMENDED SAVINGS* $79,160 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $63,329

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings
01 2.7232: Replace existing hvac unit with high efficiency model $61,033 $97,300 $45,089
474,122
kWh
$15,944
-
kW-mo/yr
02 2.4226: Use / purchase optimum sized compressor $11,002 $44,000 $7,477
78,624
kWh
$3,525
-
kW-mo/yr
03 2.4133: Use most efficient type of electric motors $4,829 $4,700 $3,282
34,508
kWh
$1,547
-
kW-mo/yr
04 2.4239: Eliminate or reduce compressed air usage $1,978 - $1,978
20,803
kWh
-
05 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $318 $600 $257
2,699
kWh
$61
-
kW-mo/yr
TOTAL RECOMMENDED $79,160 $146,600 $58,083
610,756
kWh
$21,077
-
kW-mo/yr
TOTAL IMPLEMENTED $63,329 $97,900 $47,324
497,624
kWh
$16,005
-
kW-mo/yr
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs