ITAC Assessment: SD0586
ITAC logo
ITAC Assessment: SD0586
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2019
Principal Product Windows and Doors
NAICS 326199: All Other Plastics Product Manufacturing
SIC 3089: Plastics Products, Not Elsewhere Classified
Sales Range $100
M
to 500
M
# of Employees 450
Plant Area 185,000
ft2
Annual Production 286,800
units
Production Hrs. Annual 5,720
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $262,098 3,745,477
kWh
Electricity Demand $248,489 9,158
kW-mo/yr
Electricity Fees $9,293 -
Natural Gas $29,312 3,812
MMBtu
Other Gas $180 1
MMBtu
TOTAL YEARLY COSTS $549,372
RECOMMENDED SAVINGS* $97,018 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $95,075

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings One-time Revenue or Avoided Cost Savings
01 2.7232: Replace existing hvac unit with high efficiency model $57,437 $117,800 $39,565
565,228
kWh
$17,872
-
kW-mo/yr
-
02 2.7142: Utilize higher efficiency lamps and/or ballasts $25,164 $24,783 $13,478
192,557
kWh
$10,963
-
kW-mo/yr
$723
03 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $4,548 $17,875 $2,509
35,836
kWh
$2,039
-
kW-mo/yr
-
04 2.4231: Reduce the pressure of compressed air to the minimum required $2,460 - $2,460
35,139
kWh
- -
05 2.7135: Install occupancy sensors $1,882 $330 $1,882
26,879
kWh
- -
06 2.4324: Replace hydraulic / pneumatic equipment with electric equipment $1,834 $2,795 $1,834
26,201
kWh
- -
07 2.7261: Install timers and/or thermostats $1,750 $350 $1,750
24,999
kWh
- -
08 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,943 $750 $1,599
22,781
kWh
$344
-
kW-mo/yr
-
TOTAL RECOMMENDED $97,018 $164,683 $65,077
929,620
kWh
$31,218
-
kW-mo/yr
$723
TOTAL IMPLEMENTED $95,075 $163,933 $63,478
906,839
kWh
$30,874
-
kW-mo/yr
$723
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings One-time Revenue or Avoided Cost Savings