Assessment Year | 2016 |
---|---|
Principal Product | Cosmetics and Personal Care PRoducts |
NAICS | 325620: Toilet Preparation Manufacturing |
SIC | 2844: Perfumes, Cosmetics, and Other Toilet Preparations |
Sales Range | $100 M to 500M |
# of Employees | 750 |
Plant Area |
220,000
ft2
|
Annual Production | 1,000,000
units
|
Production Hrs. Annual | 4,845
hrs
|
Location (State) | California |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $152,498 | 1,888,014 |
kWh
|
$0.081 |
Electricity Demand | $136,613 | 5,297 |
kW-mo/yr
|
$25.79 |
Electricity Fees | $7,834 | - |
|
- |
Natural Gas | $29,963 | 4,106 |
MMBtu
|
$7.30 |
TOTAL YEARLY COSTS | $326,908 | |||
RECOMMENDED SAVINGS* | $107,410 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $34,084 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Natural Gas Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.3415: Use a fossil fuel engine to cogenerate electricity or motive power; and utilize heat | $65,643 | $292,000 |
$41,977
690,413
kWh
|
$46,422
-
kW-mo/yr
|
- |
$(-22,756.0)
-
MMBtu
|
|
02 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $17,187 | $25,315 |
$9,173
113,539
kWh
|
$8,014
-
kW-mo/yr
|
- | - | |
03 | 2.6231: Utilize controls to operate equipment only when needed | $11,672 | $7,800 |
$6,518
80,669
kWh
|
$5,154
-
kW-mo/yr
|
- | - | |
04 | 2.3212: Optimize plant power factor | $4,856 | $2,339 | - | - | $4,856 | - | |
05 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $3,056 | $1,000 |
$1,692
20,939
kWh
|
$1,364
-
kW-mo/yr
|
- | - | |
06 | 2.7121: Utilize daylight whenever possible in lieu of artificial light | $2,827 | $5,600 |
$1,135
14,051
kWh
|
$1,692
-
kW-mo/yr
|
- | - | |
07 | 2.7134: Use photocell controls | $2,169 | $3,700 |
$2,006
24,819
kWh
|
$163
-
kW-mo/yr
|
- | - | |
TOTAL RECOMMENDED | $107,410 | $337,754 |
$62,501
944,430
kWh
|
$62,809
-
kW-mo/yr
|
$4,856 |
$(-22,756.0)
-
MMBtu
|
||
TOTAL IMPLEMENTED | $34,084 | $37,815 |
$19,389
239,966
kWh
|
$14,695
-
kW-mo/yr
|
- | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs