Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2013
Principal Product Steel Castings
NAICS 331513: Steel Foundries (except Investment)
SIC 3325: Steel Foundries, Not Elsewhere Classified
Sales Range $50
M
to 100
M
# of Employees 225
Plant Area 291,373
ft2
Annual Production 50,000
ton
Production Hrs. Annual 7,508
hrs
Location (State) Tennessee

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $2,534,335 65,399,706
kWh
Electricity Demand $1,943,158 150,534
kW-mo/yr
Electricity Fees $998,047 -
Natural Gas $1,392,468 187,847
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $489,014 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings One-time Revenue or Avoided Cost Savings
01 2.2424: Use heat in flue gases to preheat products or materials $129,812 $50,000 $129,812
2,309,815
kWh
- - -
02 2.2424: Use heat in flue gases to preheat products or materials $1,913 $1,500 - - $1,913
-
MMBtu
-
03 2.2442: Preheat combustion air with waste heat $6,907 $6,500 - - $6,907
-
MMBtu
-
04 2.2442: Preheat combustion air with waste heat $7,743 $6,500 - - $7,743
-
MMBtu
-
05 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $10,000 $25,000 $10,000
200,000
kWh
- - -
06 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $28,000 $35,000 $28,000
560,000
kWh
- - -
07 2.7142: Utilize higher efficiency lamps and/or ballasts $28,761 $22,540 $7,935
203,449
kWh
$5,050
-
kW-mo/yr
- $15,776
08 2.7142: Utilize higher efficiency lamps and/or ballasts $20,340 $14,342 $7,088
181,752
kWh
$3,213
-
kW-mo/yr
- $10,039
09 2.7142: Utilize higher efficiency lamps and/or ballasts $1,482 $2,477 $369
9,461
kWh
$167
-
kW-mo/yr
- $946
10 2.7142: Utilize higher efficiency lamps and/or ballasts $297 $688 $71
1,810
kWh
$45
-
kW-mo/yr
- $181
11 2.7142: Utilize higher efficiency lamps and/or ballasts $1,354 $1,340 $337
8,637
kWh
$153
-
kW-mo/yr
- $864
12 2.7142: Utilize higher efficiency lamps and/or ballasts $23,882 $52,674 $5,945
152,424
kWh
$2,695
-
kW-mo/yr
- $15,242
13 2.7142: Utilize higher efficiency lamps and/or ballasts $193,873 $235,480 $48,257
1,237,368
kWh
$21,879
-
kW-mo/yr
- $123,737
14 2.7142: Utilize higher efficiency lamps and/or ballasts $34,650 $37,444 $8,625
221,146
kWh
$3,910
-
kW-mo/yr
- $22,115
TOTAL RECOMMENDED $489,014 $491,485 $246,439
5,085,862
kWh
$37,112
-
kW-mo/yr
$16,563
-
MMBtu
$188,900
TOTAL IMPLEMENTED - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings One-time Revenue or Avoided Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs