Assessment Year | 2015 |
---|---|
Principal Product | aerospace and naval materials |
NAICS | 332999: All Other Miscellaneous Fabricated Metal Product Manufacturing |
SIC | 3429: Hardware, Not Elsewhere Classified |
Sales Range | $50 M to 100M |
# of Employees | 400 |
Plant Area |
215,000
ft2
|
Annual Production | 80,001
pieces
|
Production Hrs. Annual | 3,700
hrs
|
Location (State) | California |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $466,655 | 4,979,240 |
kWh
|
$0.094 |
Electricity Demand | $359,535 | 17,616 |
kW-mo/yr
|
$20.41 |
Electricity Fees | $22,457 | - |
|
- |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $120,645 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $120,645 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings |
---|---|---|---|---|---|---|---|
01 | 2.7232: Replace existing hvac unit with high efficiency model | $43,686 | $162,100 |
$25,048
267,347
kWh
|
$18,638
-
kW-mo/yr
|
- | |
02 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $31,173 | $100,875 |
$16,550
176,615
kWh
|
$14,623
-
kW-mo/yr
|
- | |
03 | 2.7425: Clean or color roof to reduce solar load | $25,778 | $100,200 |
$21,085
225,045
kWh
|
$4,693
-
kW-mo/yr
|
- | |
04 | 2.2314: Replace heat treating oven with more efficient unit | $13,855 | $24,332 |
$7,555
80,630
kWh
|
- | $6,300 | |
05 | 2.7135: Install occupancy sensors | $3,765 | $9,630 |
$3,765
40,178
kWh
|
- | - | |
06 | 2.7134: Use photocell controls | $1,826 | $2,590 |
$1,826
19,480
kWh
|
- | - | |
07 | 2.6231: Utilize controls to operate equipment only when needed | $562 | $214 |
$562
6,001
kWh
|
- | - | |
TOTAL RECOMMENDED | $120,645 | $399,941 |
$76,391
815,296
kWh
|
$37,954
-
kW-mo/yr
|
$6,300 | ||
TOTAL IMPLEMENTED | $120,645 | $399,941 |
$76,391
815,296
kWh
|
$37,954
-
kW-mo/yr
|
$6,300 | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs