ITAC Assessment: SD0520
ITAC logo
ITAC Assessment: SD0520
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2015
Principal Product aerospace and naval materials
NAICS 332999: All Other Miscellaneous Fabricated Metal Product Manufacturing
SIC 3429: Hardware, Not Elsewhere Classified
Sales Range $50
M
to 100
M
# of Employees 400
Plant Area 215,000
ft2
Annual Production 80,001
pieces
Production Hrs. Annual 3,700
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $466,655 4,979,240
kWh
Electricity Demand $359,535 17,616
kW-mo/yr
Electricity Fees $22,457 -
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $120,645 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $120,645

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings
01 2.7232: Replace existing hvac unit with high efficiency model $43,686 $162,100 $25,048
267,347
kWh
$18,638
-
kW-mo/yr
-
02 2.7142: Utilize higher efficiency lamps and/or ballasts $31,173 $100,875 $16,550
176,615
kWh
$14,623
-
kW-mo/yr
-
03 2.7425: Clean or color roof to reduce solar load $25,778 $100,200 $21,085
225,045
kWh
$4,693
-
kW-mo/yr
-
04 2.2314: Replace heat treating oven with more efficient unit $13,855 $24,332 $7,555
80,630
kWh
- $6,300
05 2.7135: Install occupancy sensors $3,765 $9,630 $3,765
40,178
kWh
- -
06 2.7134: Use photocell controls $1,826 $2,590 $1,826
19,480
kWh
- -
07 2.6231: Utilize controls to operate equipment only when needed $562 $214 $562
6,001
kWh
- -
TOTAL RECOMMENDED $120,645 $399,941 $76,391
815,296
kWh
$37,954
-
kW-mo/yr
$6,300
TOTAL IMPLEMENTED $120,645 $399,941 $76,391
815,296
kWh
$37,954
-
kW-mo/yr
$6,300
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs