Assessment Year | 2007 |
---|---|
Principal Product | Trailer Truck Refrigerators |
NAICS | 423740: Refrigeration Equipment and Supplies Merchant Wholesalers |
SIC | 5078: Refrigeration Equipment and Supplies |
Sales Range | $10 M to 50M |
# of Employees | 385 |
Plant Area |
176,000
ft2
|
Annual Production | 23,750
pieces
|
Production Hrs. Annual | 4,250
hrs
|
Location (State) | Puerto Rico |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $826,619 | 5,907,990 |
kWh
|
$0.14 |
Electricity Demand | $147,153 | 19,091 |
kW-mo/yr
|
$7.71 |
Electricity Fees | $6,896 | - |
|
- |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $99,900 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $71,742 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Administrative Changes Savings |
---|---|---|---|---|---|---|---|
01 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $31,769 | $1,074 |
$30,710
219,358
kWh
|
$1,059
-
kW-mo/yr
|
- | |
02 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $29,086 | $724 |
$28,075
200,537
kWh
|
$1,011
-
kW-mo/yr
|
- | |
03 | 2.6231: Utilize controls to operate equipment only when needed | $18,314 | $4,000 |
$17,370
173,710
kWh
|
$944
-
kW-mo/yr
|
- | |
04 | 4.821: Pay bills on time to avoid late fees | $6,896 | $300 | - | - | $6,896 | |
05 | 2.4231: Reduce the pressure of compressed air to the minimum required | $5,287 | $30 |
$4,419
31,567
kWh
|
$868
-
kW-mo/yr
|
- | |
06 | 2.4231: Reduce the pressure of compressed air to the minimum required | $4,557 | $30 |
$3,941
28,151
kWh
|
$616
-
kW-mo/yr
|
- | |
07 | 2.4323: Use optimum size and capacity equipment | $3,097 | $3,010 |
$2,644
15,648
kWh
|
$453
-
kW-mo/yr
|
- | |
08 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $894 | $510 |
$703
7,034
kWh
|
$191
-
kW-mo/yr
|
- | |
TOTAL RECOMMENDED | $99,900 | $9,678 |
$87,862
676,005
kWh
|
$5,142
-
kW-mo/yr
|
$6,896 | ||
TOTAL IMPLEMENTED | $71,742 | $5,618 |
$62,132
442,577
kWh
|
$2,714
-
kW-mo/yr
|
$6,896 | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Administrative Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs