ITAC Assessment: SD0517
ITAC logo
ITAC Assessment: SD0517
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2015
Principal Product Control Valves
NAICS 332911: Industrial Valve Manufacturing
SIC 3491: Industrial Valves
Sales Range $50
M
to 100
M
# of Employees 350
Plant Area 80,175
ft2
Annual Production 10,000
pieces
Production Hrs. Annual 6,120
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $723,464 7,149,360
kWh
Electricity Demand $417,243 33,643
kW-mo/yr
Electricity Fees $157,522 -
Natural Gas $41,615 6,105
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $210,723 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $91,329

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.7232: Replace existing hvac unit with high efficiency model $69,718 $163,200 $63,476
627,230
kWh
$6,242
-
kW-mo/yr
-
02 2.4231: Reduce the pressure of compressed air to the minimum required $54,474 $5,633 $42,700
421,933
kWh
$11,774
-
kW-mo/yr
-
03 2.7425: Clean or color roof to reduce solar load $54,235 $108,000 $48,205
476,321
kWh
$6,030
-
kW-mo/yr
-
04 2.6231: Utilize controls to operate equipment only when needed $18,457 $11,700 $18,457
182,354
kWh
- -
05 2.2443: Re-use or recycle hot or cold process exhaust air $5,974 $8,760 - - $5,974
-
MMBtu
06 2.1311: Replace electrically-operated equipment with fossil fuel equipment $3,975 $9,935 $3,002
29,144
kWh
$1,967
-
kW-mo/yr
$(-994.0)
-
MMBtu
07 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $3,154 $2,000 $2,520
24,469
kWh
$634
-
kW-mo/yr
-
08 2.4133: Use most efficient type of electric motors $736 $2,350 $489
4,839
kWh
$247
-
kW-mo/yr
-
TOTAL RECOMMENDED $210,723 $311,578 $178,849
1,766,290
kWh
$26,894
-
kW-mo/yr
$4,980
-
MMBtu
TOTAL IMPLEMENTED $91,329 $176,900 $84,453
834,053
kWh
$6,876
-
kW-mo/yr
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs