Assessment Year | 1994 |
---|---|
Principal Product | Plastic Buckets |
NAICS |
n/a
|
SIC | 3079: |
Sales Range | $10 M to 50M |
# of Employees | 49 |
Plant Area |
46,080
ft2
|
Annual Production | 11,000,000
pieces
|
Production Hrs. Annual | 4,200
hrs
|
Location (State) | California |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $459,537 | 6,148,886 |
kWh
|
$0.075 |
Natural Gas | $5,215 | 964 |
MMBtu
|
$5.41 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $82,779 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $76,620 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings |
---|---|---|---|---|---|
01 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $58,970 | $168,500 |
$58,970
576,202
kWh
|
|
02 | 2.4133: Use most efficient type of electric motors | $8,109 | $3,452 |
$8,109
79,132
kWh
|
|
03 | 2.4239: Eliminate or reduce compressed air usage | $3,447 | $900 |
$3,447
33,705
kWh
|
|
04 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $3,267 | $4,138 |
$3,267
31,946
kWh
|
|
05 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $1,955 | $2,545 |
$1,955
19,050
kWh
|
|
06 | 2.7241: Install outside air damper / economizer on hvac unit | $1,794 | $5,000 |
$1,794
17,585
kWh
|
|
07 | 2.7145: Install skylights | $1,675 | $4,800 |
$1,675
16,413
kWh
|
|
08 | 2.7135: Install occupancy sensors | $357 | $592 |
$357
3,517
kWh
|
|
09 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $575 | $135 |
$575
5,569
kWh
|
|
10 | 2.4314: Use synthetic lubricant | $297 | - |
$297
2,052
kWh
|
|
11 | 2.3212: Optimize plant power factor | $2,333 | $3,593 |
$2,333
-
kWh
|
|
TOTAL RECOMMENDED | $82,779 | $193,655 |
$82,779
785,171
kWh
|
||
TOTAL IMPLEMENTED | $76,620 | $179,670 |
$76,620
747,656
kWh
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs