ITAC Assessment: SF0027
ITAC logo
ITAC Assessment: SF0027
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1994
Principal Product Plastic Buckets
NAICS
n/a
SIC 3079:
Sales Range $10
M
to 50
M
# of Employees 49
Plant Area 46,080
ft2
Annual Production 11,000,000
pieces
Production Hrs. Annual 4,200
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $459,537 6,148,886
kWh
Natural Gas $5,215 964
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $82,779 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $76,620

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings
01 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $58,970 $168,500 $58,970
576,202
kWh
02 2.4133: Use most efficient type of electric motors $8,109 $3,452 $8,109
79,132
kWh
03 2.4239: Eliminate or reduce compressed air usage $3,447 $900 $3,447
33,705
kWh
04 2.7142: Utilize higher efficiency lamps and/or ballasts $3,267 $4,138 $3,267
31,946
kWh
05 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $1,955 $2,545 $1,955
19,050
kWh
06 2.7241: Install outside air damper / economizer on hvac unit $1,794 $5,000 $1,794
17,585
kWh
07 2.7145: Install skylights $1,675 $4,800 $1,675
16,413
kWh
08 2.7135: Install occupancy sensors $357 $592 $357
3,517
kWh
09 2.4111: Utilize energy-efficient belts and other improved mechanisms $575 $135 $575
5,569
kWh
10 2.4314: Use synthetic lubricant $297 - $297
2,052
kWh
11 2.3212: Optimize plant power factor $2,333 $3,593 $2,333
-
kWh
TOTAL RECOMMENDED $82,779 $193,655 $82,779
785,171
kWh
TOTAL IMPLEMENTED $76,620 $179,670 $76,620
747,656
kWh
Yearly Savings* Imp'd Cost* Electricity Usage Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs