ITAC Assessment: WM0114
ITAC logo
ITAC Assessment: WM0114
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2017
Principal Product Treated wastewater
NAICS 221320: Sewage Treatment Facilities
SIC 4952: Sewerage Systems
Sales Range $1
M
to 5
M
# of Employees 5
Plant Area 165,000
ft2
Annual Production 1,642,500
Tgal
Production Hrs. Annual 8,760
hrs
Location (State) Wisconsin

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $193,175 3,967,397
kWh
Electricity Demand $75,425 6,236
kW-mo/yr
Electricity Fees $0.0 -
Natural Gas $57,087 11,149
MMBtu
Waste Disposal Costs
Water Usage $36,043 6,032,291
Tgal
TOTAL YEARLY COSTS $361,730
RECOMMENDED SAVINGS* $51,864 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $29,215

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 3.7311: Maintain machines to reduce leaks $16,398 $20,000 $12,237
251,324
kWh
$4,161
-
kW-mo/yr
-
02 2.9111: Use solar heat to heat make-up air $13,132 $72,000 $13,132
269,711
kWh
- -
03 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $5,735 $23,350 $4,284
87,989
kWh
$1,451
-
kW-mo/yr
-
04 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $5,449 $332 $4,066
83,500
kWh
$1,384
-
kW-mo/yr
-
05 2.7231: Use radiant heater for spot heating $4,330 $1,815 - - $4,330
-
MMBtu
06 2.7135: Install occupancy sensors $3,167 $1,660 $2,363
48,532
kWh
$804
-
kW-mo/yr
-
07 2.4231: Reduce the pressure of compressed air to the minimum required $1,956 - $827
16,988
kWh
$1,129
-
kW-mo/yr
-
08 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $1,082 $3,200 $756
15,516
kWh
$327
-
kW-mo/yr
-
09 2.7134: Use photocell controls $615 $73 $459
9,424
kWh
$156
-
kW-mo/yr
-
TOTAL RECOMMENDED $51,864 $122,430 $38,123
782,984
kWh
$9,411
-
kW-mo/yr
$4,330
-
MMBtu
TOTAL IMPLEMENTED $29,215 $25,347 $17,885
367,328
kWh
$7,000
-
kW-mo/yr
$4,330
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs